Apri120, 2009—Council approved Resolution R2009-52 authorizing Amendment 1 to the Hanson <br /> Professional Services agreement. The work added by Amendment 1 includes the rehabilitation of <br /> the mechanical systems that raise and lower the sluice gates on the north side of the dam, replacing <br /> the seals for the Bascule Gates and Sluice Gates, and the removal of non-functioning heating units <br />, along the Bascule Gates. Amendment 1 was for a fee not to exceed $26,700 for a total fee of <br /> $110,100. <br /> Summary of the Major Construction History of Lake Decatur Dam <br /> Appendix A provides a brief summary of past improvements to the Lake Decatur Dam. <br /> Current Project Status <br /> The 2009 Dam Repair Project is currently out for bid. The bid opening is scheduled for June 19, <br /> 2009 and will be brought before the City Council on July 6. The estimate for the construction <br /> project is $1,410,000. A budget amendment may be sought at the time of construction contract <br /> approval depending upon the actual bids received. <br /> Current Design Services Agreement <br /> The Lake Decatur Dam is a Class 1 structure, as classified by the Illinois Department ofNatural <br /> Resources. This classification indicates that failure of the dam would have a high probability of <br /> causing loss of life and/or substantial economic loss. As a condition of the Operating Permit, the <br /> City is required to undertake annual inspections. The annual inspections typically identify <br /> maintenance issues that need to be addressed in future capital projects. <br /> On January 20, 2009, the City Council authorized a design services agreement with Hanson <br /> Professional Services (of Springfield, IL) to develop detailed design drawings and prepare <br /> construction documents for a rehabilitation project to address the recommendations contained in the <br /> annual inspection reports for the past five years. The original scope of work for this agreement <br /> identified four general groups of improvements that were needed: <br /> 1. Repairs to the training wall between gated outlet works and spillway <br /> 2. Repairs to north and south sections of the spillway <br /> 3. Repairs to south abutment and training walls <br /> 4. Repairs to the gated outlet structure. <br /> On Apri120, 2009, the City Council authorized Amendment 1 to the design services agreement to <br /> add work addressing concerns identified in a detailed inspection of the dam. The work added by <br /> Amendment 1 includes the rehabilitation of the mechanical systems that raise and lower the sluice <br /> gates on the north side of the dam, replacing the seals for the bascule gates and sluice gates, and the <br /> removal ofnon-functioning heating units. <br /> Staff recommends authorizing Amendment 2, which provides the following assistance during the <br /> bidding process and the construction phase: <br /> 1. Respond to requests for information by contractors as they review the bid documents. <br /> 2. Review the contractor's bids and determine the qualifications of the low bids. <br /> 3. Provide a written recommendation to the City of Decatur of the apparent lowest, responsible <br /> bidder. <br /> 4. Attend the pre-construction meeting to discuss the project with the contractor. <br /> 5. Assist the City in providing construction observation which will include visiting the site <br /> approximately three (3)times per week, for a duration of 22 weeks. <br /> Page � 2 <br />