My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2009-96 AUTHORIZING SECOND AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2009
>
R2009-96 AUTHORIZING SECOND AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 1:09:36 PM
Creation date
10/13/2015 1:09:35 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-96
Res Ord Title
AUTHORIZING SECOND AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES INC. FOR LAKE DECATUR DAM REPAIRS
Department
Public Works
Approved Date
6/15/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� . t <br /> APPENDIX A <br /> A Summary of the Major Construction History of Lake Decatur Dam <br /> The City owns and operates the Lake Decatur Dam located on the Sangamon River just west of <br /> Business Route U.S. 51. Built in 1922, the dam provides an impoundment for the City's source of <br /> drinking water. In 1955 bascule gates were added to the concrete spillway to increase the lake level <br /> from elevation 610 to 614.5. The following table summarizes the history of major construction <br /> projects for the Lake Decatur Dam: <br /> Year Activi <br /> 1922 Ori inal Construction <br /> 1950's Fish ladder removed <br /> 1954-55 Flashboards removed and bascule gate installed <br /> Sluice gate replacement and trash racks installed <br /> 1955-1996 Sluice ates reconditioned <br /> 1955-1996 Resurfaced downstream face of spillway access platform <br /> 1995 Overla laced on downstream face of s illway <br /> 1996 Shotcrete a lied to left and ri ht abutment walls <br /> 1998 North bascule gate hydraulic cylinders refurbished (Cylinders 1 thru 4) <br /> 2000 South bascule ate h draulic c linders refurbished (C linders 5 thru 8) <br /> 2000 Ap roximately 30 concrete anels on upstream slo e of ri ht embankment replaced <br /> 2000 Pile cap and all concrete panels along the downstream right riverbank training wall <br /> replaced. <br /> 2001 New 'oints saw cut into s illwa overla to match ori inal dam 'oints <br /> 2001 Spalling along upstream face of outlet works and downstream face of spillway <br /> patched <br /> 2001 New ri ra laced downstream of stillin basin and alon the le$ river bank <br /> 2004 New sluice gate lift mechanism at the lower tail water dam <br /> 2005 S allin alon u stream face of outlet works structure atched <br /> Page � 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.