Laserfiche WebLink
. , I <br /> � <br /> PARTI �� <br /> TSI RESPONSIBILITIES � <br /> A. PROJECT DESCRIPTION �� <br /> 7he project is described as follows: 'I <br /> Televised pipeline inspectioNsurvey of sanitary/storm sewers ranging in size from 8"to �� <br /> 96" in diameter. j <br /> This Professional Service Agreement is for 1year, fiscal year 2009-2010. I, <br /> B. SCOPE <br /> Services to be provided for the Project are as follows: <br /> TELEVISED PIPELINE 1NSPECTION/SURVEY <br /> 1. A color television camera capable of insertion into 100% humidity conditions will <br /> be used on this project. The camera head is capable of panning 270° and tilting <br /> 360°and the iris, focus and light source are all remote controlled in order to look <br /> directly at problem areas, as well as up service connections. The camera will be <br /> transported through the lines on a remote controlled transporter at approximately <br /> 30 feet per minute, stopping at problem areas to insure proper logging of data. <br /> The Data Collected, stored and downloaded to the city mainframe will be in a <br /> MPEG digital fo�mat applicable to the current City of Decatur Engineering <br /> Software, that will be used to observe and record features and conditions that will ', <br /> assist in the evaluation of the data collected and become a part of the final ' <br /> report. All inspection crew's a�e PACP Certified. I <br /> 3. Traffic control and protection for the project shall be in accordance with I.D.O.T. ', <br /> Highway Standard 701606.01. Daytime operations are proposed for the work. '' <br /> MANHOLE INVESTIGATION <br /> 1. A physical/visual investigation of each manhole using all necessary safety <br /> equipment. The investigation will include obtaining all data required to evaluate , <br /> each manhole for structural integrity, inflow/infiltration problems, flow <br /> characteristics and environmental conditions. Including all necessary � <br /> dimensions. , <br /> SMOKE TESTING I�I� <br /> 1. Insertion of an inert rype smoke bomb of three-minute duration into manholes by !, <br /> means of a 3000-cfm or larger blower. Logging of data including color photos of I <br /> locations or smoke observed. I <br /> 2 ' <br />