My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2009-52 AUTHORIZING AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2009
>
R2009-52 AUTHORIZING AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2015 1:08:37 PM
Creation date
10/14/2015 1:08:37 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-52
Res Ord Title
AUTHORIZING AMENDMENT TO AGREEMENT WITH HANSON PROFESSIONAL SERVICES, INC.
Approved Date
4/20/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� , � !��i�Vn�'��"1r!i.f:1�w <br /> � a „y��.'rP �si�.,'�,�.i. rfCd',�•'. llt• <br /> .',;,f;A� 'I��..�,J �`f',I,!�4 _ <br /> :t�,9��,�[� �y,, ����y/ AN N <br /> ' ,�P?9feR,T`�:16",�'��n:�"'.,�,s�i(.T.u�`'dM^ <br /> �"�-��`"�� Focused on customer success <br /> Apri17, 2009 <br /> Mr. Matt Newell <br /> City Engineer <br /> #1 Gary K. Anderson Plaza <br /> Decatur, IL 62523 <br /> Re: Construction Documents for Gate, Cylinder& Seal Work <br /> Lake Decatur Dam <br /> City Project 09-02 <br /> Professional Services Agreement <br /> Hanson No. 08L0198 <br /> Dear Mr. Newell: <br /> Per your request please find enclosed three copies of the Amendment to our Professional <br /> Services Agreement for the above-referenced project. If you concur, please sign both copies, <br /> keep one for your records, and return one copy to our office to my attention. <br /> Our Agreement, dated December 29, 2008, for the proposed dam repairs contains a Scope of <br /> Services related to the bascule gate and sluice gate seals; bascule gate hydraulic cylinder repairs; <br /> and outlet works sluice gate repairs. Based on limited access due to weather conditions at that <br /> time, these services were based on discussion with your office on the condition of the gates and <br /> equipment, as well as observations with limited access. Recently, our subconsultant, HDR , <br /> Engineering (�-IDR) has been able to complete their more detailed investigation and made ' <br /> recommendations for rehabilitation work related to the gate equipment and seals. , <br /> The purpose of this amendment is to provide additional compensation to Hanson and HDR for ' <br /> revised Scope of Services related to HDR's recommendations. Specifically, the effort for Gate <br /> Seal Replacement and removal of the Gate Seal Electric Heaters is anticipated to exceed the <br /> original Agreement amount. In addition, the scope of work has been expanded to include <br /> rehabilitation of the Sluice Gate Machinery which was not in the original scope of work. <br /> Another recommendation included in the �IDR report is for complete replacement of the eight <br /> hydraulic cylinders which operate the bascule gates. The lead time for fabrication and <br /> installation of new cylinders would not allow that work to be included in the 2009 construction <br /> contract. Th�refore, additior.al services related to the cylinders are not included in this <br /> amendment and would be considered as part of another contract at a later date. <br /> Hanson Professional Services Inc. <br /> 1525 S.Sixth St. • Springfield,IL 62703-2886 • Phone:(217)788-245U • Fax:(217)78�-2503 <br /> � Printed on recycled paper Offices nationwide • WN')t'.�IQI?5017-1Y7C.L'OI1J <br /> I:\08jobs\08L0198Wdmin\OS-Agreements\LA90403 Amendment 1 PSA Cover Letter.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.