� b a <br /> Engineering & Infrastructure Memorandum <br /> NO. 2009-24 <br /> DATE: Apri113, 2009 <br /> TO: Honorable Mayor Carrigan and City Council <br /> �> <br /> FROM: Ryan P. McCrady, City Manager ��C-� `� <br /> Richard G. Marley, P.E., Director for Engineering& Infrastructure <br /> SUBJECT: Agreement with URS Corporallon for Preliminary Design of the South Shores <br /> Bridge over the Sand Creek Arm of Lake Decatur <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staffthat the City Council approve the attached Resolution authorizing an <br /> Agreement with URS Corporation for the preliminary design of the South Shores Bridge over the <br /> Sand Creek Arm of Lake Decatur, and the Mayor to sign and the City Clerk to attest. The <br /> expenditure for these services is not to exceed $77,500. <br /> BACKGROUND: <br /> Prior Council Action <br /> • August 2, 2004—Council approved Resolution R2004-115 authorizing an Agreement with <br /> Homer L. Chastain&Associates (Chastain) to inspect five precast concrete deck bridges, <br /> including South Shores/ Sand Creek, for a fee not to exceed $7,965. <br /> Background <br /> The South Shores-Sandcreek Bridge was originally built in 1909. A new superstructure was placed <br /> on the old abutments in 1965. The foundation and abutments are 100 yeazs old and the <br /> superstructure is 44 years old. <br /> In 2004 The Illinois Department of Transportation(IDOT)notified governmental entities <br /> throughout the State that problems had been detected in precast deck beam bridges. These bridges <br /> are strengthened with cables that have been placed under tension within the beams in order to <br /> provide support for the structure. <br /> It had been found in other areas of the State that the tensioned cables within these bridges can <br /> deteriorate to the point of failure while showing few outward signs or damage. At the time, IDOT <br /> advised an in-depth inspection of these bridges. Chastain's 2004 review indicated a need to replace <br /> the bridge deck at a future date. Inspections carried out by City staff and various consulting <br /> engineers since 2004 have determined that the outside beams of this bridge have moved with <br /> respect to the rest of the bridge. In August of 2006, the Illinois Department of Transportation <br /> directed the City to place a weight restriction on the bridge and to perform regular follow-up <br /> inspections to monitor the outside beams of the bridge. Since the damaged beams are not in the <br /> wheel path, the bridge is safe for normal traffic; however, the bridge deck needs to be replaced in <br /> the near term before damage progresses and more strict traffic restrictions are imposed. <br /> Page � 1 <br />