My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2009-09 AUTHORIZING AGREEMENT WITH FOTH
COD
>
City Clerk
>
RESOLUTIONS
>
2009
>
R2009-09 AUTHORIZING AGREEMENT WITH FOTH
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 8:28:23 AM
Creation date
10/14/2015 3:32:16 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2009-09
Res Ord Title
AUTHORIZING AGREEMENT WITH FOTH FOR ENGINEERING SERVICES TO DESIGN FRANKLIN STREET BRIDGE LIGHTING
Approved Date
2/2/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERING & INFRASTRUCTURE MEMORANDUM <br /> NO. 2009 - 07 <br /> DATE: January 26, 2009 <br /> TO: Honorable Mayor Carrigan and City Council Members <br /> �.���� � <br /> FROM: Ryan P. McCrady, City Manager � �C� `�,� �,,���� <br /> Richard G. Marley, P.E., Engineering& Infrastructure Director �— <br /> SUBJECT: Agreement with Foth for Engineering Design of the Franklin Street Bridge <br /> Lighting, City Project 09-03. <br /> SUMMARY RECOMMENDATION: <br /> It is recommended that City Council approve the attached Resolution authorizing an agreement <br /> with Foth Infrastructure&Environment to provide engineering services for the design of the <br /> Franklin Street Bridge Lighting project. The proposed agreement is for a fee not to exceed <br /> $23,626. <br /> BACKGROUND: <br /> Franklin Street Bridge to be Reconstructed: <br /> In 2008, the City was informed by the Illinois Department of Transportation of their intention to <br /> replace the deck and portions of the substructure of the Franklin Street Bridge north of Eldorado <br /> Street in 2011. This planned work requires the removal and replacement of the 16 City owned <br /> street lights mounted on the bridge. <br /> Contract with Foth Recommended: <br /> IDOT contracted with Foth Infrastructure & Environment, an engineering firm located in <br /> Champaign, Illinois, to perform the bridge rehabilitation design. Rather than hire another <br /> engineering firm that would not be familiar with the project, City staff approached Foth to <br /> propose a scope of services for the work. Using Foth should reduce costs for the City because <br /> they are akeady familiar with the project which reduces start-up cost, and all work will be <br /> performed within one organization which reduces coordination cost. Foth will provide the <br /> lighting system design in conjunction with the structure design work they are currently <br /> completing for IDOT. The design is to be incorporated into the bridge plans and the work will <br /> be completed under the IDOT construction contract. At the completion of the design, the City <br /> will need to enter into an agreement with IDOT to pay for the street light improvements at the <br /> time this work goes out for bid. <br /> Foth is a well qualified design firm. Allowing them to perform this design work in tandem with <br /> the design work they are currently performing for IDOT will result in design cost savings to the <br /> City. The street light poles will be similar to those proposed for the Eldorado Streetscape <br /> Project. The recommended work is for a cost not to exceed $23,626. <br /> Page � 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.