Laserfiche WebLink
STAFF REPORT <br /> Decatur City Plan Commission <br /> COMMON NAME: Wind Tunnel Addition—Access Easement located in the 600-700 Blocks <br /> of West Southside Drive <br /> GENERAL INFORMATION <br /> Hearing Date Apri12, 2009 <br /> Calendar No. 09-18 <br /> Property Location Wind Tunnel Addition—Access Easement located in the 600-700 <br /> Blocks of West Southside Drive <br /> Requested Action Access Easement <br /> Petitioner IRG Decatur, LLC <br /> Representative Phillip W. Cochran,PWC <br /> BACKGROUND <br /> 1. The subject site is currently developed. <br /> 2. The Final Minor Plat of Wind Tunnel Addition was reviewed by Engineering, Fire and <br /> Planning and is approved pending approval of the access easement. The owner proposes to <br /> subdivide the property into two (2) lots in which one (1) of the lots will not have frontage or <br /> direct access to a public street. According to the Zoning Ordinance each lot shall have <br /> frontage on, direct access to, a public street or way that is improved to City standards, unless <br /> the Council shall otherwise direct, by approval of a subdivision plat so showing submitted, <br /> heard and considered in the manner provided in the subdivision Regulations for the City. <br /> 3. The purpose of the two (2) lot subdivision is to allow the owner of the old Borg <br /> Warner/Zexel facility to sell off the building commonly known as the Wind Tunnel building. <br /> The company which has leased the building for sometime desires to own the building. The <br /> Wind Tunnel building is a standalone building however it does have common access and <br /> common parking with the other buildings on site. <br /> PROJECT DESCRIPTION <br /> 4. The petitioner proposes to subdivide the property into two (2) lots. The proposed Lot Two <br /> (2) will not have direct access to Southside Drive. This will allow the petitioner to continue <br /> the sharing of the access without creating a new curb cut to Southside Drive. <br /> 5. This subdivision will create a new lot (Lot 2) which includes the Wind Tunnel building and <br /> parking. Common ingress/egress and utility easements are being platted to provide full <br /> access to the building site. <br /> 6. The Owner's Declaration has provisions to insure that the Wind Tunnel building will always <br /> have fire protection water and water service at all times. <br />