Laserfiche WebLink
! <br /> ILLINOIS ENVIRONMENTAL PROTECTION AGENCY <br /> DIVISION OF PUBLIC WATER SUPPLIES-PERMIT SECTION <br /> 1021 NORTH GRAND AVENUE, EAST-POST OFFICE BOX 19276 <br /> SPRINGFIELD, ILLINOIS 62794-9276 <br /> SCHEDULE B-WATER MAIN CONSTRUCTION <br /> 1. Name of Public Water Supply Decatur, IL#1150150 <br /> 2. Name of Project ED., Lobby and Admitting Expansions <br /> 3. A. Standard Specifications for Water and Sewer Main Construction in illinois(1986 Edition) 0 <br /> B. Engineer's Approved Specifications on file with this Agency ❑ <br /> C. Public Water Supply's Approved Specifications on file with this Agency 0 <br /> D, Specifications submitted with the plan documents ❑ <br /> 4. Existing population served by present supply 90,000 <br /> 5. Population to be served by water main extension so,000 <br /> 6. Average daily pumpage from water works (annual basis) 21Million GAL <br /> 7. Maximum day pumpage from water works 3oMillion GAL <br /> 8. Capacity of water works 36 MGD <br /> 9. Capacity of raw water source 56 MGD <br /> 10. Capacity of existing line(s) at point(s)of connection(s) 36 MGD <br /> 11. Capacity of proposed water main extension or system 36 MGD <br /> 12, Normal expected operating pressure on proposed water main extension 65 PSI <br /> 13. Minimum expected operating pressure on proposed water main extension 50 PSI <br /> 14, Pressure at point of connection at present maximum demand 60 PSI <br /> 15. Calculated pressure at point of connection under maximum demand conditions after installation of water <br /> main. 50 PSI <br /> This Agency is authorized to require thls <br /> information under I I linofs Compi led Statutes,'14'15 <br /> IL532•0159 �LCS b/38(1884�.Disclosure of this information {s <br /> requlred under that Sectlon.Failure to tlo so may <br /> PWS58(REV.&BB) prevent this form from being processed and <br /> PRINTEDONRECYCLEDPM4t could result tn your appllcatlon being tlenied. <br /> TFils form I-�as been approved by the Forms <br /> Management Center. <br />