My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-48 AMENDING CITY CODE - CHAPTER 41.1 - CONSTRUCTION STANDARDS OF FACILITIES, PUBLIC RIGHTS-OF-WAY
COD
>
City Clerk
>
ORDINANCES
>
2007
>
2007-48 AMENDING CITY CODE - CHAPTER 41.1 - CONSTRUCTION STANDARDS OF FACILITIES, PUBLIC RIGHTS-OF-WAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2015 11:03:07 AM
Creation date
10/19/2015 11:03:02 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2007-48
Res Ord Title
AMENDING CITY CODE - CHAPTER 41.1 - CONSTRUCTION STANDARDS OF FACILITIES, PUBLIC RIGHTS-OF-WAY
Approved Date
6/4/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
roadway. When installed in a residential district, utility equipment shall be <br /> placed within easements or public right of ways adjacent to rear or side <br /> yards. Utility equipment boxes shall be grouped in clusters to the greatest <br /> extent possible. No more than four (4) utility equipment boxes shall be <br /> placed in a cluster. Clusters shall not occupy more than 160 square feet of <br /> surface area when a rectangular perimeter is measured around all boxes. <br /> (c) No more than one cluster of utility boxes shall be located on a public <br /> utility easement on a lot of record or public right of way adjacent to one lot <br /> of record. Utility boxes shall be one hundred fifty feet (150') apart, unless <br /> clustered. If engineering techniques as approved by the City do not allow <br /> a distance of one hundred fifty feet (150'), the City may approve a shorter <br /> distance. <br /> (d) All gas mains shall be placed within the street right of way or within <br /> easements. <br /> (e) Underground work, either the installation of or the repair of existing <br /> sewer and water systems, cannot commence until the appropriate public <br /> or quasi-public utilities are staked and the Director of Engineering & <br /> 16. CONSTRUCTION METHODS AND MATERIALS. All construction shall <br /> meet the requirements of the City of Decatur Construction Standards except as <br /> may be modified herein. <br /> A. Standards and Requirements for Particular Types of Construction Methods. <br /> 40 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.