Laserfiche WebLink
(3) The utility shall not trench within the dri line of any tree <br /> designated by the Director of Engineering Infrastructure to be <br /> preserved. <br /> (c) Backfilling. <br /> (1) Any pit, trench, or excavation created d ring the installation of <br /> facilities shall be backfilled for its full width, depth, and length using <br /> methods and materials in accordance with�IDOT's "Standard <br /> Specifications for Road and Bridge Constr ction." When excavated <br /> material is hauled away or is unsuitable fo backfill, suitable <br /> granular backfill shall be used. <br /> (2) For a period of three years from the da e construction of a <br /> facility is completed, the utility shall be res onsible to remove and <br /> restore any backfilled area that has settle due to construction of <br /> the facility. If so ordered by the Director o Engineering & <br /> Infrastructure, the utility, at its expense, s all remove any pavement <br /> and backfill material to the top of the insta led facility, place and <br /> properly compact new backfill material, a d restore new pavement, <br /> sidewalk, curbs, and driveways to the pro er grades, as determined <br /> by the Director of Engineering & Infrastru ture. <br /> (d) Pavement Cuts. Pavement cuts for facility in tallation or repair shall be <br /> permitted on a highway only if that portion of the highway is closed to <br /> 43 <br />