Laserfiche WebLink
(4) In the case of gas pipelines of 60 psig or less, encasement may <br /> be eliminated. <br /> (5) In the case of gas pipelines or petroleum products pipelines with <br /> installations of more than 60 psig, encasement may be eliminated <br /> only if: (1) extra heavy pipe is used that precludes future <br /> ' maintenance or repair and (2) cathodic protection of the pipe is <br /> provided; <br /> (6) If encasement is eliminated for a gas or petroleum products <br /> pipeline, the facility shall be located so as to provide that <br /> construction does not disrupt the right-of-way. <br /> (f) Minimum Cover of Underground Facilities. <br /> (1) Cover shall be provided and maintained at least in the amount <br /> specified in the following table for minimum cover for the type of <br /> facility: <br />� COVER <br /> T'1( <br /> PE OF FACILITY MINIMUM <br /> Power or 30 Inches <br />� Communication <br /> Line In General <br /> Communication 241nches <br /> Line Installed by <br /> the Plowed Method <br /> Gas or Petroleum 30 Inches <br /> Products <br /> Water Line 42 inches. <br /> Sanitary Sewer, Sufficient cover to provide freeze <br /> Storm Sewer, or protection. <br /> Draina e Line <br /> 46 <br />