My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-14 REZONING PROPERTY - 229 WEST MAIN STREET
COD
>
City Clerk
>
ORDINANCES
>
2007
>
2007-14 REZONING PROPERTY - 229 WEST MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2015 1:08:39 PM
Creation date
10/19/2015 1:08:38 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2007-14
Res Ord Title
REZONING PROPERTY - 229 WEST MAIN STREET
Approved Date
3/19/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 2 <br /> 229 West Main Street <br /> March 1, 2007 <br /> 3. The proposed addition to the community center and new social rvice building will have a <br /> brick fa�ade to match the current community center farade. <br /> 4. Ninety-nine parking spaces will be provided which exceeds the equirements of the Zoning <br /> Ordinance. Fourteen of the proposed spaces provided are located in the current Union Street <br /> right-of-way which the petitioner has requested a vacation. <br /> 5. Two (2) freestanding signs and four (4) wall signs are proposed f r the development and will <br /> be built in accordance with the submitted sign drawings. Existi g signage includes one (1) <br /> free standing sign, two (2)wall signs, a wall crest and a wall mou ted bulletin board. <br /> 6. The Comprehensive Plan shows the area as Mixed Use and the c mmunity center and social <br /> service building fit within this category as they provide a place to shelter residents, distribute <br /> food and a place to worship. <br /> 7. The proposed PD will have zero (0) feet required for the building setbacks and the front yard <br /> parking setback will be 15 feet and there will be no requirement or the parking setbacks for <br /> the side and rear yards. The idea for the zero (0) setback for the buildings allows for the <br /> users of these buildings to have activities take place within the int�rior of the site. Staff finds <br /> the building setback appropriate for the general area as well as the use of the proposed <br /> development. The zero (0) setback will not adversely effect the c aracter of the surrounding <br /> area. <br /> STAFF RECOMMENDATION <br /> 1. Based on the above analysis, staff recommends approval of t e PD with the following <br /> condition: <br /> a. Final site, landscaping and lighting plans shall be reviewed b the Economic and Urban <br /> Development Department, the Department of Engineering an Infrastructure and the Fire <br /> Department prior to construction. , <br /> PLAN COMMISSION ACTION ��� <br /> 1. According to section XIX.G.2 of the Zoning Ordinance the Pla Commission shall review <br /> the application at a public hearing and will make findings conce ing the consistency of the <br /> application with the Comprehensive Plan, the Zoning Ordinance nd other land development I <br /> regulations. Based on the findings, the Plan Commission will mal�e a recommendation to the ' <br /> City Council. A motion to forward Calendar Number 07-09 tb the City Council with a <br /> recommendation for approval is suggested. <br /> The above report constitutes the testimony and recommendation of t e Planning and Economic <br /> Development Division, Economic and Urban Development Departme t, City of Decatur. <br /> Suzan Stickle <br /> Senior Planner <br /> ATTACHMENTS <br /> 1. Petition <br /> 2. Location Map <br /> 3. Site Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.