Laserfiche WebLink
Engineer shall notify, in writing, the party responsible for maintenance of the storm water <br /> management facility. Upon receipt of that notice, the responsible person shall have seven (7) <br /> calendar days to effect maintenance and repair of the facility in an approved manner. In the <br /> event that corrective action is not undertaken within that time, the City of Decatur shall take <br /> necessary corrective action. The cost of any action by the City of Decatur under this section <br /> shall be charged to the responsible party. <br /> 21. EXISTING LOCATIONS AND DEVELOPMENTS. All locations and developments at <br /> which land disturbing activities have occurred prior to the enactment of this Ordinance and <br /> meeting the criteria established in Section 3 of this Ordinance shall comply as follows: <br /> (a) Denuded areas must be vegetated or covered under the standards and guidelines <br /> specified in the BMP manual and on a schedule acceptable to the City Engineer. <br /> � (b) Cuts and slopes must be properly covered with appropriate vegetation and/or <br /> retaining walls constructed. <br /> (c) Drainage ways shall be properly covered in vegetation or secured with rip-rap, <br /> channel lining, etc., to prevent erosion. <br /> (d) Trash,junk, rubbish, etc. shall be cleared from drainage ways. <br /> (e) Storm water runoff shall be controlled to the extent reasonable to prevent <br /> pollution of local waters. Such control measures may include, but are not limited <br /> to, the following: <br /> (1) Ponds <br /> i. Detention pond <br /> ii. Extended detention pond <br /> iii. Wet pond <br /> Page '�8 <br />