Laserfiche WebLink
THE DISTRiCT AGRF,rS; <br /> ]. Payment for all services rendered under the tenns of this AGF2�EMENT shall be based on time � <br /> spent on each of the individual tasks in accordance with the attached Schedule of Charbes. The <br /> total of engineering invoicing for design c�f the K-Mari Pumping Station Design shall not exceed <br /> $25,OU0.00 without written authorization. <br /> 2. The ENGINEER may submit monthly or periodic statements requesting payment. Such <br /> statements shall be based upon the amount and value of the services provided and .expenses <br /> incurred by ENGINE�R to the date of the statement and shall be supplemented or accompanied <br /> by such supporiing data as ma}� be required by DISTRICT. <br /> 3. The DISTRI�'T agrees, to the fullest extent permitted by law, to indemnify and hold harmless <br /> the �NGINEER, its officers, directors, employees and subconsultants (collectivel}�, <br /> ENGINEER) against all damages, liabilities or costs, II1CIUdlllb I'e3SOtlflhle c1110C11EyS feeS �llld <br /> defense costs, to the eatent caused by the DISTRICT's negligent acts in COillleCtlOil with the <br /> Project and the acts of its contractors, subcontractors or consultants or anyone for whom the <br /> DISTRICT is legally liable. <br /> IT IS MUTUALLY AGREED, <br /> 1. The ENGINEER shall not be responsible for any time delays in the PROJ�CT caused by <br /> circumstances beyond the ENGINEER's control. <br /> Y <br /> 2. The DISTRICT may at any time, by written order, make changes within the general scope of this <br /> AGR�EMErTT in the sen�ices or work to be performed. If such changes cause an increase or <br /> decrease in tl�e ENGINEER's cost or time required to pe►•form any services under this <br /> AGREEMENT, an equitable adjustment shall be made and this AGR�EMENT shall be <br /> modified in writing. The ENGINEER must assert any claim for adjustment under this clause in <br /> writing within 30 days from the date of receipt of the ENGINEER of the notification of change <br /> unless the DISTRICT �rants additional time before the date of final payment. No services for <br /> which an additional compensation will be char�ed by the ENGINEER shall be furnished without <br /> the written authorization of the DISTRICT. <br /> 3. Services resulting from si�nificant changes in genera] scope of the PROJECT including, but not <br /> limited to, changes in size, complexiry, DISTRICT's schedule, or character of construction; and <br /> revising previously accepted studies, reports, design documents or contract documents when such <br /> revisions are due to causes beyond ENGINE�R's control, shall be considered as a Change in <br /> Scope. <br /> 4. Services performed durinc the performance of the AGR�EMENT made necessa�y by the "� <br /> following circumstances or events shall be considered as Additional Services: <br /> a. Services performed as a result of litigation, arbitration, public hearings or other legal or <br /> administrative roceedin�=s involvin the PROJECT other than a dis ute between the <br /> DISTRICT and ENGINEER. <br /> b. Ser��ices performed to accomplish property surveys, preparation of lecal description plats - _ <br /> and documents foi• the acquisition of land, easements and/or ri�ht-of-way, and assistance <br /> to the DISTRICT in acquiring any necessar}� land, easements and ri�ht-of-way. <br /> BGM 08-071 ENGAGREE - 3 <br />