My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-230 AUTHORIZING ADDENDUM TO PROFESSIONAL SERVICES AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-230 AUTHORIZING ADDENDUM TO PROFESSIONAL SERVICES AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2015 8:43:56 AM
Creation date
10/21/2015 8:43:56 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-230
Res Ord Title
AUTHORIZING ADDENDUM TO PROFESSIONAL SERVICES AGREEMENT WITH BAINBRIDGE, GEE, MILANSKI & ASSOCIATES, INC. WATERMAIN FROM SWTP TO THE ELEVATED TANKS DETAILED DESIGN PHASE
Approved Date
12/15/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BGM Project 04-100 ML King Water Main <br /> Water main piping into the basement of the water plant <br /> This work includes connecting to the eYisting high service pump discharge header located <br /> in the basement of the South Water Treatment Plant and creating a second discharge line <br /> that would connect to the distribution grid on Marion Avenue. Pipe diameter will be 36" <br /> to 48" in diameter. A new flow meter and check valve vault would be required on this line. <br /> Estimated construction costs $1,000,000 Engineering fees $35,000 <br /> Revising the routing of the 16" water main at Oakland and Cushing <br /> This work was required because of problems in acquiring easements in the area of the <br /> Colonial Mall. The water main layout was rerouted along the west side of Oakland Ave. <br /> (Rt. �8) and then west on Cushing Avenue. Additional IDOT permits were obtained for the <br /> portion in State of Illinois right-of-way. The additional construction costs for this rerouting <br /> are offset by not having to pay easement costs. <br /> Estimated construction costs $0 Engineering fees $10,000 <br /> Adding telemetry system �nd pressure transducers to the check valve vault on Rt. �18 <br /> Pressure transmitters and telemetry were added to the check valve site located on Rt. 48 in <br /> front of the Sanitarv District of L�ecatur's St. Louis Bridge Pump Station. This will allow <br /> operational staff to monitor real time pressure of both the new pressure zone as well as the <br /> esisting pressure zone. <br /> Estimated construction costs $30,000 Engineering fees $5,000 <br /> Conduit and fiber optic runs from the SWTP to Garfield water tower <br /> PVC conduit, pull boxes and tiber optic cable would be installed along the route of the new <br /> water main in the sections from the SWTP to the Garfield water tower. This will set up the <br /> basis of a new tiber optic communications network that would tie in kev city facilities. <br /> Although not required for the operation of the new water mains betweer. the SWTP and <br /> elevated water tanks, the new conduit can be installed under the pavement while the new <br /> mains are installed and save considerable eYpense over installing the conduit at a later date. <br /> Estimated construction costs $220,000. Additional engineering fees $20,000 <br /> Total estimated construction costs $1,250,000 <br /> Total additional engineering fees $70,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.