Laserfiche WebLink
ENG/NEERS, INC. <br /> CONSULTING 2900 N.MARTIN LUTHER K/NG JR.DR/VE�DECATUR,ILLINOIS 62526 217-877-2100�FAX 217-877-4816 <br /> ENGINEERS www.sksenqineers.com <br /> � October 15, 2008 Project No: 811163 <br /> i <br /> � Mr. Matt Newell <br /> City of Decatur, Illinois <br /> crv,L Department of Engineering and Infrastructure <br /> ENGINEERING #1 Gary K. Anderson Plaza <br /> GEOTECHNICAL Decatur, IL 62523-1196 <br /> ENGINEERING <br /> STRUCTURAL RE: Lincoln Park Drive <br /> EN'vINEEi71NG <br /> Slope Failure Remediation <br /> SURVE�NG Decatur, Illinois , <br /> SUBSURFACE I� <br /> INVESTIGATION Dear Matt: I <br /> ENVIRONMENTAL I�i <br /> 1NVESTIGATIONS SKS Engineers, Inc. (SKS) is pleased to prepare this proposal for civil engineering '�, <br /> CONSTRUCTION services for the remediation of the slope along Lincoln Park Drive and the '� <br /> QUALITYCONTROL Sangamon River. We have reviewed the additional information you requested for <br /> SOILS✓MA7ERIALS <br /> TESTlNG this project and estimate the not-to-exceed cost to provide survey/geotechnical/civil <br /> engineering services below. <br /> • Phase 1 ........................................................................................... $5,000.00 <br /> o Survey - Perform additional field survey of approximately 100 feet <br /> along the slope to establish additional features and digital terrain <br /> modeling (DTM) data for developing plans and cross sections. <br /> $1,200.00 <br /> o Geotechnical Investigation — Perform a geotechnical investigation of <br /> the slope to determine the limits of the failed material. This information <br /> shall be included on the drawings. $2,600.00 <br /> o Contractor Coordination — Coordinate the drawings to address <br /> concerns of the contractors interested in repairing the failed slope. <br /> ' $1,200.00 <br /> • Phase 2........................................................................................... $6,000.00 <br /> o Detailed Construction Plans — Prepare/Revise construction plans for <br /> � the design. This will include but not be limited to: <br /> i. Plan Sheet(s� Plan sheets of the project detailing the design. <br /> ii. Cross Sections — Cross section sheets of the project length <br /> detailing the roadway alignment at 100' minimum increments <br /> and additional locations as required. <br /> iii. Miscellaneous Details — Standard and Special Details for <br /> � improvements outlined on the plan sheets and specifications. <br />