My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-182 AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR PROFESSIONAL SERVICES
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-182 AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR PROFESSIONAL SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2015 9:58:53 AM
Creation date
10/21/2015 9:58:47 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-182
Res Ord Title
AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR PROFESSIONAL SERVICES FOR THE GARFIELD AVE. WATER TANK MAINTENANCE CONTRACT
Approved Date
11/3/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c:a7F����:�.ar�k-:;sc�kc�=�snG. <br /> YEAR 2009 2010 2011 2012 2013 2014 2015 2016 <br /> exterior overcoat yes <br /> wet interior repaint yes <br /> seal roof lap seams yes <br /> round roof hatch yes <br /> lower riser manway yes <br /> overflow screen and flapper yes <br /> balcony opening cover yes <br /> floor drain screen yes <br /> interiorladder yes <br /> roof railing&painters rail yes <br /> repaint pit piping yes <br /> fill pitdng an wet interior steel yes <br /> replace sidewall ladder with vertical ladder yes <br /> replace roof ladder with safety climb yes <br /> grease seals on anchor chairs yes <br /> repair overflow support tabs yes <br /> engineering&contingencies yes <br /> visual inspection yes yes yes yes yes <br /> interior cleaning&full inspection yes yes <br /> emergency services&graffiti removal yes yes yes yes yes yes yes yes <br /> coatings warranty yes yes yes yes yes yes yes yes <br /> costperyear $139,136 $139,136 $139,136 $139,136 $139,136 $54,270 $54,270 $54,270 <br /> total cost through 2016 $858,490 <br /> netpresentvaluetotalcostthru 2016 $769,620 <br /> GARFIELD TANK-COMPARABLE CITY PLAN <br /> YEAR 2009 2010 2011 2012 2013 2014 2015 2016 <br /> exterior overcoat $276,000 <br /> wet interior repaint $288,000 <br /> seal roof lap seams $3,000 <br /> round roof hatch $3,000 <br /> lower riser manway $5,000 <br /> overflow screen and flapper $1,000 <br /> balcony opening cover $500 <br /> floor drain screen $1,000 <br /> interiorladder $7,ppp <br /> roof railing&painters rail $15,000 <br /> repaint pit piping $5,000 <br /> fill pitting on wet interior steel $500 <br /> replace sidewall ladder with vertical ladder $9,000 <br /> replace roof ladder with safety climb $1,000 <br /> grease seals on anchor chairs $1,000 <br /> repair overflow support tabs $2,500 <br /> engineering&contingencies at 25% $154,625 <br /> visual inspection $1,500 $1,654 $1,736 $1,914 $2,010 <br /> interior cleaning&full inspection $6,000 $6,946 <br /> emergency services&graffiti removal no no no no no no no no <br /> coatings warranty yes yes no no no no no no <br /> costperyear $773,125 $1,500 $6,000 $1,654 $1,736 $6,946 $1,914 $2,010 <br /> total cost through 2016 $794,885 <br /> net present value total cost thru 2016 $769,439 <br /> How much more is USC propusai? <br /> totalcostthrough 2016 $63,605 <br /> net present value total cost thru 2016 $181 <br /> 9-17-08 revision <br />
The URL can be used to link to this page
Your browser does not support the video tag.