My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-182 AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR PROFESSIONAL SERVICES
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-182 AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR PROFESSIONAL SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2015 9:58:53 AM
Creation date
10/21/2015 9:58:47 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-182
Res Ord Title
AUTHORIZING THE EXECUTION OF AN AGREEMENT FOR PROFESSIONAL SERVICES FOR THE GARFIELD AVE. WATER TANK MAINTENANCE CONTRACT
Approved Date
11/3/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Schedule A <br /> Renovation Specifications <br /> Exterior <br /> l. All exterior surfaces must be pressure washed with a minimum of 4,000 P.S.I. washer to remove any <br /> surface contamination. <br /> 2. All rusted areas must be Hand/Power tool cleaned per SSPC-SP2, SP3 cleaning methods. <br /> 3. All rusted or bare areas must be spot primed with a rust inhibitive metal primer. <br /> 4. One (1) full intermediate coat of a Tnemec compatible Series coating shall be applied to complete exterior <br /> surfaces(100%). <br /> 5. One (1) full finish coat of a Tnemec compatible Series coating shall be applied to complete exterior <br /> surfaces(100%). <br /> 6. Apply logos. <br /> [nterior <br /> 1. The complete interior(100%)shall be abrasive blast cleaned to SSPC-SP No. 10"Near White"finish. <br /> 2. After abrasive cleaning, all surfaces shall be cleaned of any dust residue or foreign debris. <br /> 3. A high build epoxy liner manufactured by the Tnemec Company shall be applied as follows: <br /> a. Primer Coat: One [1] complete coat of Tnemec Series 20 Epoxy or equivalent shall be applied to <br /> achieve a dry film thickness of 3 to 5 mils. <br /> Finish Coat: One [1] complete finish coat of Tnemec Series 20 Epoxy or equivalent shall be <br /> applied to achieve a dry film thickness of 4 to 6 mils. <br /> b. ContrastinQ Color: Each coat of epoxy paint shall be of contrasting color. <br /> c. Stripe Coat: One additional coat of epoxy shall be applied by brush and roller to all weld seams. <br /> d. Caulk Seams: All roof seams shall be sealed and caulked. <br /> 4. After the liner has properly cured,the interior surfaces shall be disinfected per A.W.W.A. Spray Method <br /> No. 2 (200 PPM). <br /> 5. The spent abrasive media shall be tested per TCLP-(8)Heavy Metals as mandated by the State. <br /> 6. Once the tests results confirm the non-hazardous status of the wastes,the spent abrasive shall be disposed of <br /> properly. <br /> 7. The Tank shall be sealed and made ready for service. <br /> Repairs <br /> L [nstall access ladder safety climb 14. Fill pitting on wet interior steel <br /> 2. Install overflow screen 15. Install roof railing <br /> 3. Install interior ladder <br /> 4. Install bolted riser manway <br /> 5. Install overflow flapper <br /> 6. Install round roof hatch <br /> 7. Install grease seals on anchor chairs <br /> 8. Replace cover on electrical box near ladder <br /> 9. SSPC #2/3, apply 2 coats to all pit piping. <br /> 10. Replace sidewall ladder with vertical ladder,platform with handrails, and safety climb. <br /> 11. Repair Overflow Support tabs <br /> 12. Install a screen on the floor drain <br /> 13. Install hatch style cover over balcony opening <br /> Page 6 of 6 <br /> O 2007 Utility Service Co., Inc. <br /> Rev. 04/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.