My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-132 AUTHORIZING AGREEMENT CLARK DIETZ, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-132 AUTHORIZING AGREEMENT CLARK DIETZ, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2015 11:29:30 AM
Creation date
10/21/2015 11:29:28 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-132
Res Ord Title
AUTHORIZING AGREEMENT CLARK DIETZ, INC. FOR ENGINEERING SERVICES TO UPDATE THE STORM WATER MASTER PLAN
Approved Date
9/2/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineering Cost Estimale Clark Dietz,Inc. ' <br /> City of Decatur Labor/Billing Worksheets • <br /> Stormwater Master Plan Uptlate and Priority Watershed Study <br /> Sr.Proj. Engineer Engineer Engineer Technician Admin Total Total � <br /> Manager IV III I/II II Hours Salary <br /> $155.00 $120.00 $105.00 $95.00 $75.00 $70.00 <br /> Project Element <br /> . . .. . - - - - - -- - � - -- - - -------. .. . _.____ . . <br /> B. REVISE EXISTING MASTER PLAN DOCUMENT <br /> - - - - -- --- - - - <br /> 1. Prepare a history of the timeline for stormwater planning in Decatuc Use existing Master 1 2 3 $395.00 <br /> Plans and information from Ciry staff. Prepare iniormation for Exeatrve Summary of the <br /> updated Master Plan <br /> 2. Insert updated problem area maps and describe observed patterns. Compare to 2002 1 2 8 11 $1,155.00 <br /> Masler Plan fintlings and summarize. <br /> 3. Summarize existing City funding mechanisms for stormwater,including current budget 4 4 $460.00 <br /> limi�ations. Insert text to reveal typical expenditures for similar communities(or storm <br /> sewer system maintenance and capital improvements. This will be part of a new chap�er <br /> enlitled"Stormwater Intrastructure Funding" <br /> 4. Add a summary of potential funding options to the"Stormwater Infrastructure Funding" 2 6 4 12 $1,410.00 <br /> chapter,focusing on the benefits of a Stormwater Utility. List the key steps in planning <br /> and implementing a Stormwater Utiliry,mcluding a summary of other Stormwater U�ilities <br /> in Illinois. <br /> 5. Work wilh City slafl to determine a list of 3 to 4 Early Action Projects(EAPs)that can be 1 8 8 17 $1,875.00 <br /> addressed in the near term to generate public support for stormwater inirastructure <br /> needs. These projects will be but targeted pro�ecls to address documented flooding <br /> problem areas. <br /> 6. Add a section on stormwater system maintenance,inclutling recommendations on how 18 20 38 $4,260.00 <br /> maintenance actrvities can be enhanced and/or better coordinatetl to optimize the cost- <br /> effectiveness of maintaining Decatur's syslem of storm sewers.This will include field <br /> insoection of ditches.etc <br /> 7. Review ihe City's current stormwater ordinance(Ciry Code Chapter 38)and develop a list 2 6 8 $1,030.00 <br /> of potential enhancements to address proper flood routing belween developmenis, <br /> appropriate stormwater BMPs�o satisiy NPDES stormwater quality requirements,antl <br /> otheritlenUhed changes. <br /> 8. Update the NPDES Phase II permit section�o retlect current IEPA reqwrements and 2 8 6 16 $1,900.00 <br /> future expectations for permit compliance. Include a summary of anticipated compliance <br /> costs and recommendations to optimize the Citys resources for permrt comphance <br /> 9. Attend a coordination meeting with City and BGM staff to discuss Ihe Master Plan 10 8 1 79 $2,030.00 <br /> preparation,share key information,and plan tuture coordination efforts for watershed <br /> studies. Prepare a meetmg summary. <br /> 10. Identify the Priority 1 watershed tor subsequent study and motleling. Prepare a 2 12 10 24 $2,700.00 <br /> preliminary scoping report for the Priority Watershed,describing the key objectrves for <br /> Ihe watershed analysis,anticipated modeling�echniques,and Ihe key problem areas to <br /> stutly.Include preliminary cost estimate. <br /> 11. Intemal Report QA/QC 4 4 4 12 $1,520.00 <br /> 12 Prepare and submit a Draft Stormwater Master Plan Update to City staff for review. 2 14 16 24 3 59 $6,160.00 <br /> Submit the report in PDF format. Meet wrth Ciry staff to receive comments and discuss <br /> final modihcatwns. <br /> 13. Prepare the Final Draft of the Stormwater Master Plan Uptlate Submit up to four(4)hard 2 6 8 4 20 $2,250.00 <br /> copies antl a PDF of Ihe report. <br /> 14. Presen�Ihe Stormwater Master Plan Update to Crty Council. 8 8 2 2 20 $2,530.00 <br /> ToWI Hours Section B. 27 108 54 68 0 6 263 <br /> Total Billing Section B. $4,185.00 $72,960.00 $5,670.00 $6,460.00 $0.00 $420.00 $29,695.00 <br /> Average Billing Section B. $»p,g� <br /> 8/18/2008 Exhibit A Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.