My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-97 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-97 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2015 2:09:02 PM
Creation date
10/22/2015 2:09:02 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-97
Res Ord Title
AUTHORIZING AGREEMENT BLANK, WESSELINK, COOK & ASSOCIATES, INC. FOR ENGINEERING SERVICES TO INSPECT GARFIELD AVENUE OVERPASS
Approved Date
6/16/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- R , . <br /> Engineering& Infrastructure Memorandum <br /> NO. 2008-51 <br />� DATE: June 9, 2008 <br /> TO: Honorable Mayor Pro Tem Carrigan <br /> City Council Members <br /> FROM: John A. Smith, Interim City Manager ��J �/� � <br /> Richard G. Marley, P.E., Director of ineerin & Inf�`astru� <br /> g g <br /> Matthew C. Newell, P.E., City Enginee.q��/ <br /> YIµ/� <br /> SUBJECT: Agreement with Blank, Wesselink, Cook& Associates to Inspect the <br /> Garfield Avenue Bridge, City Project 04-27 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staffthat the City Council approve the attached resolution <br /> approving an expenditure of$6,100 with Blank, Wesselink, Cook &Associates, (BWC), <br /> to provide a structural inspection of the Garfield Avenue Bridge over the CNIC tracks <br /> (between Clinton Street and Illinois Street), City Project 04-27. <br /> BACKGROUND: <br /> On September 6, 2005, the City Council awarded a contract to BWC to provide <br /> professional design services to rehabilitate the Garfield Avenue Bridge. Previous <br /> inspections of the bridge had determined that some portions of the structure were <br /> deteriorating and in need of repair. <br /> During the in depth design process, it was determined that the deterioration noted in <br /> previous bridge inspections did not pose an imminent threat to the safety of the bridge <br /> and the public. Rehabilitation work is necessary on the bridge but was not determined to <br /> be an immediate need. No weight restrictions were necessary for the bridge. Funding <br /> limitations and project priorities in the City's Capital Improvement Plan have delayed the <br /> bridge work to approximately 5 years in the future. Staff recommends that BWC be <br /> retained to provide a follow-up structural review of the bridge to determine if it is <br /> feasible to delay the proposed Garfield Bridge rehabilitation work for up to 5 years. <br /> POTENTIAL OBJECTION: There are no known objections to this <br /> request. <br /> INPUT FROM OTHER SOURCES: None <br />
The URL can be used to link to this page
Your browser does not support the video tag.