My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-89 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-89 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2015 2:32:58 PM
Creation date
10/22/2015 2:32:57 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-89
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT STREET RECONSTRUCTION
Approved Date
6/2/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. - <br /> Engineering & Infrastructure Memorandum <br /> � NO. 2008-46 <br /> DATE: May 23, 2008 <br />� TO: Honorable Mayor Osborne and City Council <br /> FROM: John A. Smith, Interim City Manager C�� <br /> �c�(a.�,� <br /> Richard G. Marle , P.E. Director of En eerin & In rastructure <br /> Y � g g <br /> Matthew C.Newe P.E. Ci En ' e � <br /> � � � � � <br /> SUBJECT: Street Reconstruction, City Project 08-24 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for Street Reconstruction, City Project 08-24, to Dunn Company, A Division of Tyrolt, <br /> Inc., as the lowest, responsible bidder in the amount of$594,118.60, and that the Mayor be <br /> authorized to execute the contract, and the City Clerk to attest. <br /> BACKGROUND: � <br /> The Street Reconstruction Project is structured to provide a significant structural improvement to <br /> severely deteriorated roadways. Streets requiring reconstruction generally have pavement that is <br /> badly deteriorated through the combined effects of age and use. These pavements can no longer be <br /> effectively maintained by the City's street crews nor can a standard mill and overlay be applied with <br /> the hope of long term success. An additional goal of the project is to restore any existing curb and <br /> gutter to full function wherever possible and reduce the crown of the street. <br /> Street reconstruction work involves the removal of all, or portions, of the existing street,the <br /> construction of a stabilized road base where necessary and the placement of a new asphalt surface. <br /> A listing of the streets included in this year's reconstruction project is attached for your information. <br /> Included in the work, is the resurfacing of a driveway at 2747 North Sangamon Road which has <br /> been damaged by the frequent use as an access road for maintenance of the dredge pipeline. This <br /> work will cost approximately$11,000 and is being paid for by the Water Fund. Other work <br /> included is curb and gutter replacement for Mass Transit to mitigate tripping hazards and improve <br /> drainage at their facilities. This work will cost approximately$2,300 and is being paid for by Mass <br /> Transit. <br /> The project plans and specifications were prepared by Engineering Division staff. The project was <br /> advertised May 9, 2008, and bids were opened on May 23, 2008. The results for the letting are as <br /> follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under) <br /> Engineer's Estimate $641,639.60 ---- <br /> Dunn Company, A <br /> Division of Tyrolt, Inc. $594,118.60 (-7.41%) <br /> Entler Excavating Co., Inc. $636,859.48 (-0.74%) <br /> Illinois Valley Paving Co. $652,881.22 1.75% <br />
The URL can be used to link to this page
Your browser does not support the video tag.