Laserfiche WebLink
Recommendations: <br /> Improve Detention Basin Design <br /> 1. Encourage all municipalities or counties in the watershed to change their ordinances to reflect a more <br /> restricted release rate for the watershed. The drainage and stormwater management system should be <br /> designed to limit the peak discharge leaving the site to no more than .04 cfs/acre at a 2-year <br /> frequency, 24-hour duration storm event and .15 cfs/acre at a 100-year frequency, 24-hour duration <br /> storm event. <br /> 2. Incorporate a broader scale of detention basin design concepts to meet the primary benefits for <br /> stormwater and pollution management and as many secondary benefits as possible such as recreation, <br /> aesthetics, and habitat. <br /> • Encourage wet bottom detention basins for the purpose of improving water quality by capturing <br /> pollutants. <br /> • Wet detention basins should be deep enough to support fish and aquatic wildlife and allow for <br /> public use. <br /> • Dry detention basin should be designed to remove stormwater pollutants by having 80% of their <br /> bottom area with standing water no longer then 72 hours. <br /> • Incorporate functioning wetland areas. <br /> • Distance between detention inlets and outlets should be maximized. <br /> • Design wet basins with 3:1 shoreline slopes and native aquatic vegetation. <br /> 3. Require detention on all new development for commercial and industrial sites and residential <br /> dwellings of more than one residence per two-acre lot. <br /> . 4. Design a development so that small rainfall events would be collected from impervious surfaces <br /> (roofs, driveway, roads, sidewalks, etc)and flow into a rain garden to prevent stormwater from <br /> entering directly into storm sewers or road ditches. <br /> Incorporate Better Design Strategies for New and Redeveloped Sites <br /> 1. Reduce impervious surfaces with narrower streets, shorter driveways, narrower sidewalks, reduced <br /> parking space size, shared parking between adjacent user, shared parking between opposite peak <br /> businesses, and permeable paving. <br /> 2. Promote natural drainage with vegetated(Bio) swales planted with native grass species. <br /> 3. Establish filter strips or buffers. <br /> 4. Maintain open spaces for environmental benefits, wildlife, and recreation. Floodplains, wetlands, <br /> natural areas, or any open area can serve as open space. <br /> 5. Encourage infiltration practices such as infiltration trenches and basins. <br /> 6. Install filtration and biological treatments(i.e. constructed wetlands) <br /> 7. Manage runoff from road surfaces. <br /> 8. Introduce native trees, shrubs, grasses, and forbs. <br /> Preserve the 100-year Floodplain <br /> 1. Deter all construction or filling in of the FEMA 100-year mapped floodplain. Encourage the update of <br /> the current FEMA maps. <br /> 2. Discourage the placement of detention basins in the floodplain. <br /> 3. The placement of a detention basin in a flood fringe area should require compensatory storage for 1.5 <br /> times the volume below the base flood elevation occupied by the detention basin. <br /> 4. No reduction in existing floodway surface area. <br /> 5. Deter on-stream detention. <br /> 6. Preserve these areas as open space or natural areas planted with native species. Return floodplain to <br /> . original native vegetation. <br /> 9 <br />