Laserfiche WebLink
.Exhibit C — Scope of Services to be Provided by the ENGINEER <br /> Retain Massie Massie and Associates of Springfield, Illinois as a subconsultant for: <br /> L out of corridor streetscape improvements including street configuration, parking lanes, media , <br /> side alks, pedestrian crossings, fences and barriers, light fixtures, benches, planters, entrance <br /> monu ents, street signs,tree and planting areas,. <br /> Coordinat n and review meetings with the CONSULTANT, LA AND STATE. <br /> Coordinate, p pare graphic exhibits and participate in one (1)public information mee � g and one (1) <br /> public hearing a meetings with landowners regarding easements and right of way eds. <br /> Prepare layout plan details, specifications for street lighting, street furnishings enches, planters, etc.), <br /> signs and monuments, treet trees and planting areas. <br /> � Provide general and techni I administration and quality assurance me res. <br /> Make such detailed surveys as e necessary for the planning, preli nary design and final design of the <br /> PROJECT. <br /> Perform data collection. <br /> Perform Phase I Environmental Site Asse sment and pre re Technical Memo. <br /> Perform supplemental traffic counts, analysis nd pre re Traffic Anaiysis Technical Memo. <br /> Perform safety analysis and prepare Safety Anal s Technical Memo. <br /> Review proposed streetscape improvements r impa t on capacity and intersection level of service. <br /> Prepare plan sheets and typical sections r�+tth landscape provements and other proposed geometric <br /> features. <br /> Prepare an Alignment and Capacity echnical Memo. <br /> Establish existing and proposed ights of way and property lines. pare Right of Way Technical Memo <br /> summarizing takes, impacts a remainders. <br /> Inventory existing propert ngress/egress and circulation conditions. <br /> Evaluate impacts of pro sed improvements on ingress/egress and circul �on. Prepare Access Study <br /> Technical Memo. <br /> Compute constru on quantities and unit costs and summarize in a Cost Estima Technical Memo. <br /> Plan, schedul , attend and document up to fifteen (15) stakeholder meetings, one ( public information <br /> meeting an ne (1)public hearing. <br /> Prepar Public Involvement Technical Memo. <br /> Pre re and submit a preliminary report which summarizes the Technical Memos. <br /> repare the final report by revising the preliminary report based on LA and STATE review comm ts. <br /> Submit the final report and make a formal presentation to the LA. <br />