Laserfiche WebLink
1 1 <br /> i � � � <br /> D. All cranes and boom equipment under load will stop work while <br /> train is passing (including pile driving). <br /> E. Swinging loads must be secured to prevent movement while train is ' <br /> passing. '� <br /> F. No loads will be suspended above a moving train. ', <br /> G. No equipment will be allowed within 25' of centerline of track ', <br /> without specific authorization of the flagman. ' <br /> H. Trucks, tractors or any equipment will not touch ballast line without ' <br /> specific permission from railroad official and flagman. ' <br /> I. No equipment or load movement within 25' or above a standing train I'', <br /> or railroad equipment without specific authorization of the flagman. i <br /> J. All operating equipment within 25' of track must halt operations , <br /> when a train is passing. All other operating equipment may be I, <br /> halted by the flagman if the flagman views the operation to be i <br /> dangerous to the passing train. <br /> K. All equipment, loads and cables are prohibited from touching rails. <br /> L. While clearing and grubbing, no vegetation will be removed from I <br /> railroad embankment with heavy equipment without specific <br /> permission from the Railroad Engineer and flagman. <br /> M. No equipment or materials will be parked or stored on Railroad's <br /> property unless specific authorization is granted from the Railroad <br /> Engineer. <br /> N. All unattended equipment that is left parked on Railroad property �', <br /> shall be effectively immobilized so that it cannot be moved by <br /> unauthorized persons. ' <br /> O. All cranes and boom equipment will be turned away from track after � <br /> each work day or whenever unattended by an operator. II� <br /> 14. INSURANCE: <br /> A. In addition to any other forms of insurance or bonds required under ' <br /> the terms of the contract and specifications, the Prime Contractor ' <br /> 12 <br />