My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-15 AUTHORIZING UNDERPASS PAINTING AND SIDEWALK CANOPY AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-15 AUTHORIZING UNDERPASS PAINTING AND SIDEWALK CANOPY AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 11:48:46 AM
Creation date
10/23/2015 11:48:43 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-15
Res Ord Title
AUTHORIZING UNDERPASS PAINTING AND SIDEWALK CANOPY AGREEMENT WITH NORFOLK SOUTHERN RAILWAY COMPANY - WEST MAIN / MILLIKIN STREETSCAPE IMPROVEMENT PROJECT
Approved Date
2/4/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> s <br /> 2.1.5 Prior to beginning work, the Contractor shall submit a plan outlining (a) the <br /> cleanup of spills resulting from failure of the waste material containment system, <br /> (b) the means of identifying failure of the containment system or other such I <br /> incident, and(c)the method of collecting and storing waste material. II <br /> 2.1.6 Spent abrasive and paint waste must not be allowed to contact the soil. The I <br /> Contractor shall collect and store the waste material in approved waste i <br /> containers. <br /> 2.1.7 All waste material shall be disposed of at a licensed sanitary landfill unless the <br /> waste is determined to be hazardous. All hazardous waste shall be disposed of at <br /> an approved hazardous waste facility. <br /> 2.1.8 The Contractor must submit to the Engineer a written statement that he employs <br /> or subcontracfs an individual or company knowledgeable in all state and federal <br /> laws pertaining to waste management. The statement shall include the name, <br /> address,and telephone number(s)of the lmowledgeable party. <br /> 2.2 Minimal Cleaning Option <br /> 2.2.1 All surfaces must be sound, clean, dry, and free of oil, grease, mildew, form <br /> release agents, laitance, and foreign matter. <br /> 3 PAINTING <br /> 3.1 Paint Application <br /> 3.1.1 Paint shall be applied in accordance with SSPC-PA 1, "Shop, Field, and <br /> Maintenance Painting of Steel," and the Dry Film Thiclaiess (DFT) shall be <br /> measured in accordance with SSPC-PA 2, "Measurement of Dry Coating <br /> Thiclrness With Magnetic Gages." <br /> 3.1.2 One (1) full prime coat shall be applied promptly after cleaning, and all blast- <br /> cleaned surfaces shall be coated before completion of the workday or before <br /> visible oxidation occurs. <br /> 3.1.3 Prior to the spray application, an initial prime coat shall be applied to all rivets <br /> and bolts with a round or oval brush. <br /> 3.1.4 Not more than twenty-four (24) hours shall elapse between the applications of <br /> the prime coat and the intermediate coat. <br /> 4 MATERIALS <br /> 4.1 Packaging and Shipping <br /> 4.1.1 Paint shall be received at the point of use in original containers and shall be <br /> carefully stored. Paint shall be freshly mixed and shall be ordered only a <br /> sufficient length of time in advance of its use to ensure an adequate supply on <br /> hand at all times during the work. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.