My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-15 AUTHORIZING UNDERPASS PAINTING AND SIDEWALK CANOPY AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-15 AUTHORIZING UNDERPASS PAINTING AND SIDEWALK CANOPY AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 11:48:46 AM
Creation date
10/23/2015 11:48:43 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-15
Res Ord Title
AUTHORIZING UNDERPASS PAINTING AND SIDEWALK CANOPY AGREEMENT WITH NORFOLK SOUTHERN RAILWAY COMPANY - WEST MAIN / MILLIKIN STREETSCAPE IMPROVEMENT PROJECT
Approved Date
2/4/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � <br /> � t ; � <br /> 5.3.2 Thinning of the paint shall not relieve the Contractor from achieving the <br /> specified Dry Film Thiclrness. <br /> 6 ENVIRONMENTAL AND SAFETY <br />� 6.1 Air Quality Requirements <br /> 6.1.1 Abrasive blasting operations shall be conducted in full compliance with all � <br /> current federal primary and secondary air quality standards (40 CFR 50) as well <br /> as all state and local air quality requirements. <br />' 6.1.2 The Contractor shall pursue an"air permit" for the work from the state and local <br /> air regulatory authorities. In the event such agency does not require permitting <br /> for the work, the Contractor shall obtain this determination from the agency in <br /> writing. If the regulatory agency will not furnish written determination, or in the I <br /> absence of state and local regulatory authorities, the Contractor shall furnish the <br /> Engineer a written discussion of his efforts to obtain an"air permit." <br /> 6.1.3 The Contractor shall ensure one hundred (100) percent containment of <br /> particulates during abrasive blasting activities. <br /> 6.2 Worker Health and Safety <br /> 6.2.1 Prior to beginning work, the Contractor must certify that he adopts the Worker <br /> Health and Safety Plan included in Section 8 of this Specification. As an <br /> alternative, the Contractor may execute his own Worker Health and Safety Plan <br /> that adheres to the requirements of 29 CFR 1926.62, "Lead Exposure in ', <br /> Construction," provided that the Contractor's plan receives prior review and ', <br /> approval by the Railway. Proposed Worker Health and Safety Plans should be !� <br /> directed to the Office of Chief Engineer — Bridges and Structures, 99 Spring � <br /> Street, S.W.,Box 142,Atlanta, Georgia 30303. �i <br /> 6.2.2 The Contractor shall review and discuss the Worker Health and Safety Plan with �I <br /> the Engineer prior to beginning work. I <br /> 6.2.3 The Contractor shall fully comply with the requirements of 49 CFR 214, <br /> "Railroad Workplace Safety." <br /> 63 Waste Storage and Disposal <br /> 6.3.1 The Contractor shall furnish a sufficient quantity of waste storage drums at no <br /> additional cost to the Railway. All drums shall be new or reconditioned, and <br /> shall be approved for hazardous waste containment. <br /> 6.3.2 All waste is to be analyzed, characterized, and disposed of by the Railway unless <br /> specified otherwise. If the Contractor is awarded the task of waste analysis and <br /> disposal, the Contractor shall prepare a waste analysis and disposal plan <br /> describing the type of analysis to be performed, the laboratory to perform the <br /> analysis, the permanent waste disposal facility and waste transport service to be <br /> utilized, and measures to secure the waste material prior to its transport from the <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.