My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2008-15 AUTHORIZING UNDERPASS PAINTING AND SIDEWALK CANOPY AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2008
>
R2008-15 AUTHORIZING UNDERPASS PAINTING AND SIDEWALK CANOPY AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2015 11:48:46 AM
Creation date
10/23/2015 11:48:43 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2008-15
Res Ord Title
AUTHORIZING UNDERPASS PAINTING AND SIDEWALK CANOPY AGREEMENT WITH NORFOLK SOUTHERN RAILWAY COMPANY - WEST MAIN / MILLIKIN STREETSCAPE IMPROVEMENT PROJECT
Approved Date
2/4/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � <br /> . t ��, , <br /> 7.4 General <br /> 7.4.1 A written compliance plan is required if lead-containing materials are present at <br /> the work site. <br /> 7.4.2 If lead is present at the work site, the Contractor must certify each of the <br /> following statements by signing in the space provided: <br /> a. All employees potentially exposed to lead have been given information and <br /> training concerning lead exposure in construction, which includes but is not <br /> limited to the applicable work procedures, the provisions of 29 CFR 1926, <br /> the hazards of lead exposure, protective measures that can be taken, and the <br /> contents of the written compliance plan. <br /> (Contractor) (Date) <br /> b. All employees using respiratory protection have been medically evaluated, <br /> trained,and properly fitted for the respirators being worn. <br /> (Contractor) � (Date) <br /> c. The Contractor will maintain all the documentation required in connection , <br /> with the OSHA regulations for lead exposure. , <br /> (Contractor) (Date) , <br /> 7.5 Description of Lead-disturbing Activities I <br /> 7.5.1 The Contractor shall identify all lead-disturbing activities expected in connection <br /> with the project. � <br /> 7.6 Initial Exposure Assessment <br /> 7.6.1 The Contractor must determine if the potential exists for any employees to be <br /> exposed to lead above the OSHA action level during any part of the work. <br /> Employee exposure is the exposure that would occur if the employees were not <br /> using a properly�tting respirator. <br /> 7.6.2 Initial determination of lead exposure may be based on task-related triggers <br /> referenced in 29 CFR 1926,initial air monitoring, or objective data. <br /> 7.6.3 Objective data used from air monitoring collected during the previous twelve <br /> (12) months must be submitted and included as part of this plan. To be <br /> considered as valid documentation, each source of the data must include the <br /> following information and the results judged to be similar to those expected to be <br /> developed under the working conditions on this project: <br /> a. Specific description and location of the lead disturbing activity; <br /> b. Environmental conditions at the time of monitoring.; <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.