Laserfiche WebLink
' � RESOLUTION NO. R2007-196 <br /> � LoCal AgenCy State Contract Day Labor Local Contract RR Force Account <br /> Illinois Department_ <br /> of Transportation City of Decatur <br /> Local Agency Amendment#1 section Fund Type ITEP Number <br /> for Federal Participation 05-00525-00-SW HPP <br /> Construction En ineerin Ri ht-of-Wa <br /> Job Number Project Number Job Number Project Number Job Number Project Number <br /> P-97-049-06 HPP-4114(001) <br /> This Amendment is made and entered into between the above local agency hereinafter referred to as the"LA"and the state of Illinois, <br /> acting by and through its Department of Transportation, hereinafter referred to as"STATE". The STATE and LA jointly propose to improve <br /> the designated location as described below. The improvement shall be constructed in accordance with plans approved by the STATE and <br /> the STATE's policies and procedures approved and/or required by the Federal Highway Administration hereinafter referred to as"FHWA". <br /> BE IT MUTUALLY AGREED that all remaining provisions of the original agreement not altered by this Amendment shall remain in full force <br /> and effect and the Amendment shall be binding upon and inure to the benefit of the parties hereto,their successors and assigns. <br /> Rmersded D�visicn of Cost <br /> Type of Work FHWA % STATE % LA % Total <br /> Pa�ticipating Construction ( ) ( ) ( ) <br /> Non-Participating Construction ( ) ( ) ( ) <br /> Preliminary Engineering 173,600 ( * ) ( ) 43,400 ( ) 217,000 <br /> Construction Engineering ( ) ( ) ( ) <br /> Right of Way ( ) ( ) ( ) <br /> Railroads ( ) ( ) ( ) j <br /> Utilities ( ) ( ) ( ) I <br /> TOTAL $ 173,600 $ $ 43,400 $ 217,000 <br /> *80� HPP funds NTE $173,600 (shortfall to be covered by the local <br /> agency in the event the federal allocation differs from this amount) . <br />� NOTE: The costs shown in the Division of Cost table are approximate and subject to change. The final LA share is dependent on the final Federal and <br /> State participation. The actual costs will be used in the final division of cost for billing and reimbursment. <br />' If funding is not a percentage of the total,place an asterisk in the space provided for the percentage and explain above. <br /> The Federal share of construction engineering may not exceed 15%of the Federal share of the final construction cost. <br /> APPROVED APPROVED <br /> State of Illinois <br /> Name Paul Osborne art t of rtati <br /> Title Mayor <br /> County Boar hairperson/MayorNillage President/etc. Milton R.Sees,Secretary of Transportation <br /> / � <br /> Signature �—_L�GO ��� Date 1--1�—� <br /> Date Octob 6, 200� <br /> ATTEST: �� �\ G�C�� - <br /> Christine M. Reed, Director of ighways/Chief Engineer <br /> TIN Number C� y erk <br /> N�� <br /> NOTE: If signature is by an APPOINTED official,a resolution authorizing Ellen J.Schanzl -Haskins,Chief Counsel <br /> said appointed official to execute this Amendment is required. <br /> Ann L.Schneider,Director of Finance and Administration <br /> Printed 10/10/2007 BLR 05311 (Rev.09/19/07) <br />