My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2007-159 AUTHORIZING THE EXECUTION OF AN ENGINEERING SERVICES AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2007
>
R2007-159 AUTHORIZING THE EXECUTION OF AN ENGINEERING SERVICES AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 11:41:05 AM
Creation date
10/30/2015 11:41:05 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2007-159
Res Ord Title
AUTHORIZING THE EXECUTION OF AN ENGINEERING SERVICES AGREEMENT FOR HIGH SERVICE PUMP STATION AND DISTRIBUTION STORAGE STUDY
Approved Date
8/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 � <br /> DEPARTMENT OF WATER MANAGEMENT <br /> Memorandum No. 2007- 22 <br /> August 08, 2007 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Gar , City Manager <br /> John A. Sm' , Assistant City Manager for Public Services <br /> Keith D. Ale nder, Director of Water Management (//� <br /> I`'•�C <br /> SUBJECT: High Servi e Pump Station and Distribution Storage Study <br /> Engineering Services Agreement <br /> SUMMARY RECOMMENDATION: <br /> Council adopt the attached Resolution approving an Engineering Services Agreement '� <br /> with Strand Associates for a High Service Pump Station and Distribution Storage Study <br /> at a cost not to exceed,$55,000. <br /> BACKGROUND: <br /> The study consists of two parts: <br /> 1. A review of the South Water Treatment Plant's (SWTP) water pumping <br /> configuration that is necessary for maintaining desired distribution system <br /> pressure and efficient electric power consumption prior to the construction of the <br /> new water main from the SWTP to the two existing water tanks on Division St. <br /> and Garfield Ave. Construction of the new main is anticipated to begin next year. <br /> 2. A review of the SWTP's and water distribution storage requirements that is <br /> necessary to ensure that our water system has enough drinking water storage to <br /> adequately meet the needs of our growing system, fire suppression requirements <br /> and future distribution hydraulic modifications. <br /> Strand Associates is recommended for this project as they have successfully worked <br /> with the City for the past several years on similar projects. They also maintain a rather <br /> complex computer software program providing detailed hydraulic analysis of the City's <br /> water infrastructure that is an important component of these types of studies. <br /> POTENTIAL OBJECT�ON: <br /> None foreseen. <br /> INPUT FROM OTHER SOURCES: <br /> Strand Associates. <br />
The URL can be used to link to this page
Your browser does not support the video tag.