Laserfiche WebLink
EQUIPMENT EXPENSE TOTAL EQUIP. AMOUNT <br /> DATE DESCRIPTION HOURS RATE <br /> 06/07/07 50,000 Ib. GVW Tandem Dump#4 - 33.20 - <br /> 50,000 Ib. GVW Tandem Dump#7 - 33.20 - <br /> 18,000 Ib. GVW Service Truck#2 3.00 18.75 56.25 <br /> 50,000 Ib. GVW&25 T Low Boy 3.00 41.30 123.90 <br /> 143 HP Excavator on Track - 64.37 - <br /> 95 HP Loader Backhoe - 39.00 - <br /> 125 HP Cat. Track/Loader - 61.20 - <br /> 300 Sq. Ft. Trench Box per Day#1 - 150.00 - <br /> Traffic Control per Day - 65.00 - <br /> 06/08/07 50,000 Ib. GVW Tandem Dump#4 - 33.20 - <br /> 50,000 Ib. GVW Tandem Durnp#7 4.00 33.20 132.80 <br /> 18,000 ib. GVW Service Truck#2 9.00 18.75 168.75 <br /> 50,000 Ib. GVW&25 T Low Boy 4.00 41.30 165.20 <br /> 143 HP Excavator on Track 8.00 64.37 514.96 <br /> 95 HP Loader Backhoe 4.00 39.00 156.00 <br /> 125 HP Cat. Track/Loader - 61.20 - <br /> 300 Sq. Ft. Trench Box per Day#1 1.00 150.00 150.00 <br /> Traffic Control per Day - 65.00 - <br /> TOTAL EQUIPMENT EXPENSE 1,467.86 II! <br /> PAGE 2 <br />