My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2007-113 AUTHORIZING EXECUTION OF TEMPORARY EASEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2007
>
R2007-113 AUTHORIZING EXECUTION OF TEMPORARY EASEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 3:06:37 PM
Creation date
10/30/2015 3:06:37 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2007-113
Res Ord Title
AUTHORIZING EXECUTION OF TEMPORARY EASEMENT - 2823 SANGAMON ROAD
Approved Date
6/18/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br /> � <br /> Name: CLOYD D. AND RUTH A. BOLT <br /> Parcel #: 14-13-03-101-014 <br /> Ternporary Easement#: 2 <br /> Project: LAKE DECATUR BASIN 6 DREDGING PROJECT <br /> Grantee: CTTY OF DECATUR. II.LINOIS <br /> SPECIAL CONSIDERATIONS: <br /> 1. The owners will allow the City and their contractors to have access to the creek <br /> through their driveway and yard. The City and their contractors will notify the <br /> owner prior to the use of construction equipment across the driveway or access <br /> across the yard. If ruts are created, the City or their contractor shall be required to <br /> �11 in the ruts and reseed the area. The grass reseeding mix shall be one <br /> appropriate for yards rather than highways. <br /> 2. The permanent slope protection and the alignment shall be as shown on sheet 19 <br /> of the construction drawings as finally approved for construction. <br /> 3. Any trees that die as a result of construction operations shall be removed and <br /> replaced by the City. The replacement trees shall be of similar size and species if <br /> possible, or if that is not reasonable, the homeowner shall be consulted prior to the <br /> tree replacement. <br /> � 4. The existing garage and workshop is shown on sheet 19 as partially within the <br /> Temporary Easement area. That part of the easement shall not be used by the <br /> City or its contractor, to eliminate possible damage to the building. <br /> 5. The City and its contractor shall take special precaution to avoid damage to the <br /> septic tank lateral located behind the existing garage and workshop, to avoid loss <br /> of service or discharge to the ditch. <br /> H:IUSERS\AIRPORlILAND\OOS?0?I 2100-Lake Decatur Basis 6 Dred��in�\Parcels I-.a-9\Parcel 2\Appraisal & <br /> Arni�ic;r„��, F�lo\GYLIf[]IT Q D�..:�e.l� ,i.... <br />
The URL can be used to link to this page
Your browser does not support the video tag.