My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2007-96 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2007
>
R2007-96 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 4:12:17 PM
Creation date
10/30/2015 4:12:14 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2007-96
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT CONCRETE PAVEMENT RESTORATION SOUTH WATER TREATMENT PLANT, WOODFORD AVE, 27TH STREET
Approved Date
6/4/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineering & Infrastructure Memorandum <br /> NO. 2007-26 <br /> May 24, 2007 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garm ity Manager �-7��� "' <br /> Richard G. ley, P.E., Director of Engineering & nfra§tructur��'"''— <br /> Matthew C. N well, P.E., City Engineer� <br /> o-i� `�J <br /> SUBJECT: Concrete Pavement Restoration: <br /> South Water Treatment Plant, Woodford Avenue, 27th Street <br /> City Project 07-11 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the contract <br /> for Concrete Pavement Restaration: South Water Treatment Plant, Woodford Avenue, 27th Street, City <br /> Project 07-11, to Otto Baum Company, Inc., as the lowest, responsible bidder in the amount of <br /> $505,462.80 to reconstruct the South Water Treatment Plant driveway and back lot, perform joint <br /> replacement on Woodford Avenue and repair failed pavement sections on 27th Street, and that the <br /> Mayor be authorized to execute the contract, and the City Clerk to attest. <br /> BACKGROUND: <br /> This project is to reconstruct the South Water Treatment Plant driveway and back lot, perform joint <br /> replacement on Woodford Avenue, north of Garfield Avenue, and repair failed pavement sections on <br /> 27`n Street, as shown on the attached maps. The work will include removal of the existing failed <br /> concrete pavement, stabilizing the road base and placing new concrete pavement. The project also <br /> includes added quantities to perform "on call" concrete pavement repairs throughout the remainder of <br /> the fiscal year. <br /> The project plans and specifications were prepared by Engineering Division staff. The project was <br /> advertised May 9, 2007, and bids were opened on May 24, 2007. The results for the letting are as <br /> follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under) <br /> Engineer's Estimate $ 645,887.50 ---- <br /> Otto Baum Company, Inc. $ 505,462.80 (-21.74%) <br /> Entler Excavating Co., Inc. $ 594,478.50 ( -7.96%) <br /> Christy-Foltz, Inc. Non-Responsive Bid <br /> Beniach Construction Co., Inc. $ 485,362.00 (-24.85%) <br />
The URL can be used to link to this page
Your browser does not support the video tag.