, � . . . <br /> Engineering & Infrastructure Memorandum <br /> NO. 2007-27 <br /> May 29, 2007 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garm ity Manager � � <br /> Richard rley, P.E., Director of Engineering &'In�"r�� c ure <br /> Matthew C. ewell, P.E., City Enginee�r"''"1 <br /> 6 <br /> SUBJECT: Street Restoration, City Project 07-08, Section No. 07-00708-00-FP <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for Street Restoration, City Project 07-08, to Dunn Company, A Division of Tyrolt, <br /> Inc., as the lowest, responsible bidder in the amount of$2,175,390.40, and that the Mayor be <br /> authorized to execute the contract and the City Clerk to attest. <br /> BACKGROUND: <br /> The Engineering Division inspects and rates approximately 1/2 of the City's streets on a yearly <br /> basis. The results of these inspections are input into a computer database which is used to <br /> project the future condition of the streets based on their current condition, historical condition, <br /> surface type (i.e. brick, concrete, asphalt, etc.), average daily traffic, and traffic type (i.e. trucks, <br /> cars, etc.). This data is then paired with available funding and is used as a basis to aid City <br /> Engineering in the preparation of the City's yearly street improvement program. Staff then <br /> determines which streets need to have the surface restored or be totally reconstructed. <br /> The Street Restoration Project generally involves the placement of a 1 to 2 inch asphalt surface <br /> course on an existing paved surface. A portion of the existing pavement is often milled off to <br /> reduce the impact of the overlay on existing curbs and driveways. If additional structural <br /> capacity is desired in the pavement,no milling may take place prior to the overlay. The two <br /> main purposes of the Street Restoration Project are (1) to increase the useful life of a pavement <br /> in advance of its deteriorating to a condition that would require its complete reconstruction and <br /> (2) to improve the street's ride ability. This year's program includes approximately eight <br /> centerline miles of streets in the City. A listing of streets in this year's project is attached. <br /> The project scope and specifications were prepared by the Engineering Division and approved <br /> by the Illinois Department of Transportation(IDOT) for the use of Motor Fuel Tax funds. The <br /> project was advertised on May 16, and bids were opened on May 29, 2007. The results of the <br /> letting are as follows (bid tabulation attached): <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over (-Under) <br /> Engineer's Estimate $1,990,791.80 ------- <br /> Dunn Company $2,175,390.40 9.27% <br /> Illinois Valley Paving Co. $2,204,605.85 10.74% <br />