My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2007-73 AUTHORIZING AGREEMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2007
>
R2007-73 AUTHORIZING AGREEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 8:52:59 AM
Creation date
11/2/2015 8:52:58 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2007-73
Res Ord Title
AUTHORIZING AGREEMENT TELE SCAN, INC. ANNUAL SEWER TELEVISING PROGRAM
Approved Date
5/7/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � � I�I <br /> PARTI <br /> TSI RESPONSIBILITIES <br /> A. PROJECT DESCRIPTION <br /> The project is described as follows: <br /> Televised pipeline inspectioNsurvey of 250,000 L.F. of sanitary/storm sewers ranging in �, <br /> size from 8"to 96"in diameter. ' <br /> This Professional Service Agreement is for finro years, with options for one additional ' <br /> year. The initial year is for the Fiscal Year of 2007-2008. ; <br /> B. SCOPE I!I <br /> Senrices to be provided for the Project are as follows: 'i <br /> TELEVISED PIPELINE INSPECTION/SURVEY I <br /> 1. A color television camera capable of insertion into 100% humidity conditions will �'I <br /> be used on this project. The camera head is capable of panning 270°and tilting I <br /> 360°and the iris, focus and light source are all remote controlled in order to look I <br /> directly at problem areas, as well as up service connections. The camera will be <br /> transported through the lines on a remote controlled transporter at approximately <br /> 30 feet per minute, stopping at problem areas to insure proper logging of data. <br /> 2. A video tape recorder in VHS format or video CD/DVD format will be used to <br /> observe and record features and conditions that will assist in the evaluation of <br /> the data collected and become a part of the final report. II <br /> 3. Traffic oontrol and protection for the project shall be in accordance with I.D.O.T. <br /> Highway Standard 701606.01. Daytime operations are proposed for the work. II <br /> MANHOLE INVESTIGATION I <br /> 1. A physicaUvisual investigation of each manhole using all necessary safety � <br /> equipment. The investigation will include obtaining all data required to evaluate <br /> each manhole for structural integrity, inflow/infiltration problems,flow <br /> characteristics and environmentat conditions. Including all necessary dimensions <br /> for the purpose of making detailed drawings. <br /> SMOKE TESTING <br /> 1. Insertion of an inert type smoke bomb of three-minute duration into manholes by <br /> means of a 3000-cfm or larger blower. Logging of data including color phatos of <br /> locations or smoke observed. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.