My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2007-30 ACCEPTING BID AND AUTHORIZING CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2007
>
R2007-30 ACCEPTING BID AND AUTHORIZING CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 10:19:03 AM
Creation date
11/2/2015 10:18:59 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2007-30
Res Ord Title
ACCEPTING BID AND AUTHORIZING CONTRACT OTTO BAUM, INC. TRANSFER HOUSE RESTORATION
Approved Date
3/5/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.4 Subtract amounts, if any,for which the Architect has withheld or nullified a Certificate for Payment <br /> as provided in Section 9.5 of AIA Document A201-1997. <br /> §5.1.7 The progress payment amount determined in accordance with Section 5.1.6 shall be further modified under <br /> the following circumstances: <br /> .1 Add,upon Substantial Completion of the Work,a sum sufficient to increase the total payments to the <br /> full amount of the Contract Sum,less such amounts as the Architect shall determine for incomplete <br /> Work, retainage applicable to such work and unsettled claims; and <br /> (Section 9.8.5 of AIA Document A201-1997 requires release of applicable retainage upon Substantial <br /> Completion qf Work with consent of suret��, if any.) <br /> .2 Add,if final completion of the Work is thereafter materially delayed through no fault of the <br /> Contractor,any additional amounts payable in accordance with Section 9.10.3 of AIA Document <br /> A201-1997. <br /> §5.1.8 Reduction or limitation of retainage,if any,shall be as follows: <br /> (If'it is intended,prior to Substantial Completion of the entire Work, to reduce or limit the retainage resulting from <br /> the percentages inserted in Sections 5.1.61 and 5.1.6.2 above, a�id this is raot explained elsewhere in the Contract <br /> Documents, insert here provisions for such reduction or limitation.) <br /> � N/A <br /> §5.1.9 Except with the Owner's prior approval,the Contractor shall not make advance payments to suppliers for <br /> materials or equipment which have not been delivered and stored at the site. <br /> §5.2 FINAL PAYMENT <br /> §5.2.1 Final payment,constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the <br /> Contractor when: <br /> .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct <br /> Work as provided in Section 12.22 of AIA Document A201-1997, and to satisfy other requirements, <br /> if any,which extend beyond final payment;and <br /> .2 a final Certificate for Payment has been issued by the Architect. <br /> §5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the <br /> Architect's final Certificate for Payment,or as follows: <br /> ARTICLE 6 TERMINATION OR SUSPENSION <br />, §6.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document <br /> A201-1997. <br /> §6.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201-1997. <br /> ARTICLE 7 MISCELLANEOUS PROVISIONS <br /> 7.1 Where reference is made in this A reement to a rovision of AIA Documen AZ 1-1 r n <br /> § g t 0 997 o a other Contract <br /> P <br /> Document,the reference refers to that provision as amended or supplemented by other provisions of the Contract <br /> Documents. <br /> §7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated <br /> below,or in the absence thereof,at the legal rate prevailing from time to time at the place where the Project is <br /> located. <br /> (Insert rate of interest agreed upon, if any.) <br /> AIA Document A101n"—1997.Copyrlght OO 1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991 and 1997 by The American <br /> Institute of Architects. All rlghts reserved. WARNING:This AIA� Document is protected by U.S.Copyright Law and International Treaties. 4 <br /> Unauthorized reproduction or distribution of this AIA�Document,or any portion of it,may result in severe civil and criminal penalties,and will be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:45:08 on 03/15/2007 under Order <br /> No.UNLICENSED which expires on 11/18/2007,and is not for resale. <br /> User Notes: (2272062370) <br />
The URL can be used to link to this page
Your browser does not support the video tag.