R2007-30 ACCEPTING BID AND AUTHORIZING CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2007
>
R2007-30 ACCEPTING BID AND AUTHORIZING CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 10:19:03 AM
Creation date
11/2/2015 10:18:59 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2007-30
Res Ord Title
ACCEPTING BID AND AUTHORIZING CONTRACT OTTO BAUM, INC. TRANSFER HOUSE RESTORATION
Approved Date
3/5/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Documents.The Architect's review of the Contractor's submittals shall not relieve the Contractor of the obligations <br /> under Sections 3.3,3.5 and 3.12.The Architect's review shall not constitute approval of safety precautions or,unless <br /> otherwise specifically stated by the Architect,of any construction means,methods,techniques,sequences or <br /> procedures.The Architect's approval of a specific item shall not indicate approval of an assembly of which the item <br /> is a component. <br /> §4.2.8 The Architect will prepare Change Orders and Construction Change Directives,and may authorize minor <br /> changes in the Work as provided in Section 7.4. <br /> §4.2.9 The Architect will conduct inspections to determine the date or dates of Substantial Completion and the date <br /> of final completion,will receive and forward to the Owner, for the Owner's review and records,written warranties <br /> and related documents required by the Contract and assembled by the Contractor, and will issue a final Certificate <br /> for Payment upon compliance with the requirements of the Contract Documents. <br /> §4.2.10 If the Owner and Architect agree,the Architect will provide one or more project representatives to assist in <br /> carrying out the Architect's responsibilities at the site.The duties,responsibilities and limitations of authority of <br /> such project representatives shall be as set forth in an exhibit to be incorporated in the Contract Documents. <br /> §4.2.11 The Architect will interpret and decide matters concerning performance under and requirements of, the <br /> Contract Documents on written request of either the Owner or Contractor.The Architect's response to such requests <br /> will be made in writing within any time limits agreed upon or otherwise with reasonable promptness. If no <br /> agreement is made concerning the time within which interpretations required of the Architect shall be furnished in <br /> compliance with this Section 4.2,then delay shall not be recognized on account of failure by the Architect to furnish <br /> such interpretations until 15 days after written request is made for them. <br /> §4.2.12 Interpretations and decisions of the Architect will be consistent with the intent of and reasonably inferable <br /> from the Contract Documents and will be in writing or in the form of drawings.When making such interpretations <br /> and initial decisions,the Architect will endeavor to secure faithful performance by both Owner and Contractor,will <br /> not show partiality to either and will not be liable for results of interpretations or decisions so rendered in good faith. <br /> §4.2.13 The Architect's decisions on matters relating to aesthetic effect will be final if consistent with the intent <br /> expressed in the Contract Documents. <br /> §4.3 CLAIMS AND DISPUTES <br /> §4.3.1 Definition. A Claim is a demand or assertion by one of the parties seeking,as a matter of right,adjustment or <br /> interpretation of Contract terms,payment of money,extension of time or other relief with respect to the terms of the <br /> Contract.The term"Claim" also includes other disputes and matters in question between the Owner and Contractor <br /> arising out of or relating to the Contract.Claims must be initiated by written notice.The responsibility to <br /> substantiate Claims shall rest with the party making the Claim. <br /> §4.3.2 Time Limits on Claims.Claims by either party must be initiated within 21 days after occurrence of the event <br /> giving rise to such Claim or within 21 days after the claimant first recognizes the condition giving rise to the Claim, <br /> whichever is later.Claims must be initiated by written notice to the Architect and the other party. <br /> §4.3.3 Continuing Contract Performance.Pending final resolution of a Claim except as otherwise agreed in writing <br /> or as provided in Section 9.7.1 and Article 14,the Contractor shall proceed diligently with performance of the <br /> Contract and the Owner shall continue to make payments in accordance with the Contract Documents. <br /> §4.3.4 Claims for Concealed or Unknown Conditions.If conditions are encountered at the site which are(1) <br /> subsurface or otherwise concealed physical conditions which differ materially from those indicated in the Contract <br /> Documents or(2)unknown physical conditions of an unusual nature,which differ materially from those ordinarily <br /> found to exist and generally recognized as inherent in construction activities of the character provided for in the <br /> Contrac[Documents,then notice by the observing party shall be given to the other party promptly before conditions <br /> are disturbed and in no event later than 21 days after first observance of the conditions.The Architect will promptly <br /> invesUgate such conditions and,if they differ materially and cause an increase or decrease in the Contractor's cost <br /> of,or time required for,performance of any part of the Work, will recommend an equitable adjustment in the <br /> Contract Sum or Contract Time,or both.If the Architect determines that the conditions at the site are not materially <br /> AIA Document A201TM—1997.Copyright O 1911,1915,1918,1925,1937,1951,1958,1961,1963,1966,1970,1976,1987 and 1997 by The American <br /> Institute of Architects. All rights reserved. WARNING:This AIA� Document is protected by U.S.Copyright Law and International Treaties. 19 <br /> Unauthorized reproduction or distribution of this AIA�Document,or any portion of it,may result in severe civil and criminal penalties,and will be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:16:56 on 03/13l2007 under Order I <br /> No.UNLICENSED which expires on 11/18/2007,and is not for resale. <br /> User Notes: (2584627897) <br />