§6.1.2 When separate contracts are awarded for different portions of the Project or other construction or operations <br /> on the site,the term"Contractor"in the Contract Documents in each case shall mean the Contractor who executes <br /> each separate Owner-Contractor Agreement. <br /> §6.1.3 The Owner shall provide for coordination of the activities of the Owner's own forces and of each separate <br /> contractor with the Work of the Contractor, who shall cooperate with them.The Contractor shall participate with <br /> other separate contractors and the Owner in reviewing their construction schedules when directed to do sa The <br /> Contractor shall make any revisions to the construction schedule deemed necessary after a joint review and mutual <br /> agreement.The construction schedules shall then constitute the schedules to be used by the Contractor,separate <br /> contractors and the Owner until subsequently revised. <br /> §6.1.4 Unless otherwise provided in the Contract Documents, when the Owner performs construction or operations <br /> related to the Project with the Owner's own forces,the Owner shall be deemed to be subject to the same obligations <br /> and to have the same rights which apply to the Contractor under the Conditions of the Contract,including,without <br /> excluding others,those stated in Article 3,this Article 6 and Articles 10, 11 and 12. <br /> §6.2 MUTUAL RESPONSIBILITY <br /> §6.2.1 The Contractor shall afford the Owner and separate contractors reasonable opportunity for introduction and <br /> storage of their materials and equipment and performance of their activities,and shall connect and coordinate the <br /> Contractor's construction and operations with theirs as required by the Contract Documents. <br /> §6.2.2 If part of the Contractor's Work depends for proper execution or results upon construction or operations by <br /> the Owner or a separate contractor,the Contractor shall,prior to proceeding with that portion of the Work,promptly <br /> report to the Architect apparent discrepancies or defects in such other construction that would render it unsuitable <br /> for such proper execution and result�s. Failure of the Contractor so to report shall constitute an acknowledgment that <br /> the Owner's or separate contractor's completed or partially completed construction is fit and proper to receive the <br /> Contractor's Work,except as to defects not then reasonably discoverable. <br /> §6.2.3 The Owner shall be reimbursed by the Contractor for costs incurred by the Owner which are payable to a <br /> separate contractor because of delays,improperly timed activities or defective construction of the Contractor.The <br /> Owner shall be responsible to the Contractor for costs incurred by the Contractor because of delays,improperly <br /> timed activities,damage to the Work or defective construction of a separate contractor. <br /> §6.2.4 The Contractor shall promptly remedy damage wrongfully caused by the Contractor to completed or partially <br /> completed construction or to property of the Owner or separate contractors as provided in Section 10.2.5. <br /> §6.2.5 The Owner and each separate contractor shall have the same responsibilities for cutting and patching as are <br /> described for the Contractor in Section 3.14. <br /> §6.3 OWNER'S RIGHT TO CLEAN UP <br /> §6.3.1 If a dispute arises among the Contractor,separate contractors and the Owner as to the responsibility under <br /> their respective contracts for maintaining the premises and sunounding area free from waste materials and rubbish, <br /> the Owner may clean up and the Architect will allocate the cost among those responsible. <br /> ARTICLE 7 CHANGES IN THE WORK <br /> §7.1 GENERAL <br /> §7.1.1 Changes in the Work may be accomplished after execution of the Contract,and without invalidating the <br /> Contract,by Change Order,Construction Change Directive or order for a minor change in the Work,subject to the <br /> limitaUons stated in this Article 7 and elsewhere in the Contract Documents. <br /> §7.1.2 A Change Order shall be based upon agreement among the Owner,Contractor and Architect;a Construction <br /> Change Directive requires agreement by the Owner and Architect and may or may not be agreed to by the <br /> Contractor;an order for a minor change in the Work may be issued by the Architect alone. <br /> §7.1.3 Changes in the Work shall be performed under applicable provisions of the Contract Documents, and the <br /> Contractor shall proceed promptly,unless otherwise provided in the Change Order,Construction Change Directive <br /> or order for a minor change in the Work. <br /> AIA Document A201TM—1997.Copyright OO 1911,1915,1918,1925,1937,1951,1958,1961,1963,1966,1970,1976,1987 and 1997 by The American <br /> Institute of Architects. All rights reserved. WARNING:This AIA� Document is protected by U.S.Copyright Law and International Treaties. 24 � <br /> Unauthorized reproduction or distribution of this AIA�Document,or any portion of it,may result in severe civil and criminal penalties,and will be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 16:16:56 on 03/13/2007 under Order ' <br /> No.UNLICENSED which expires on 11/18/2007,and is not for resale. <br /> User Notes: (2584627897) I <br />