My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2007-23 AUTHORIZING AGREEMENT PHILLIP W. COCHRAN ENGINEERING, INC.
COD
>
City Clerk
>
RESOLUTIONS
>
2007
>
R2007-23 AUTHORIZING AGREEMENT PHILLIP W. COCHRAN ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 10:29:36 AM
Creation date
11/2/2015 10:29:35 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2007-23
Res Ord Title
AUTHORIZING AGREEMENT PHILLIP W. COCHRAN ENGINEERING, INC. FULTON AVENUE & 32ND STREET STORM DRAINAGE IMPROVEMENTS
Approved Date
2/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• , <br /> phillip w. cochran • consulting engineer <br /> January 23, 2007 <br /> Mr. Matt Newell <br /> City Engineer <br /> City of Decatur <br /> #1 Gary K. Anderson Plaza <br /> Decatur, IL 62523 <br /> Subject: Professional Engineering Proposal <br /> Storm Drainage Project <br /> Fulton & 32"d Street <br /> Dear Matt: <br /> In accordance with your request I am pleased to submit the following proposal to <br /> provide engineering services for a drainage project located generally in the Fulton Drive <br /> and 32"d Street vicinity. <br /> PWC AGREES <br /> 1. To complete a topographic survey of the project area with the intent that a <br /> storm drainage improvement be designed to remedy local flooding. <br /> 2. To make a drainage study of the area and propose a solution to the <br /> recurrent surface flooding at the Fulton Drive and 32"d Street intersection <br /> and surrounding properties. <br /> 3. To prepare a construction plan for the drainage improvements. Said plan <br /> will be completed to allow the City of Decatur to take bids in accordance <br /> with their required procedures for bidding. <br /> 4. To complete all items of work within 60 days of authorization to proceed. <br /> 5. To complete all work at a fee of$7500. <br /> 6. To complete construction easement documents and permanent easement <br /> documents (if required) at an hourly rate for services performed. <br />� 5130 hickory point frontage road • suite 2 • decatur, illinois 62526 • phone (217) 875-3333 • fax (217) 875-3371 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.