My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2007-17 AUTHORIZING AGREEMENT URS CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2007
>
R2007-17 AUTHORIZING AGREEMENT URS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 10:44:49 AM
Creation date
11/2/2015 10:44:47 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2007-17
Res Ord Title
AUTHORIZING AGREEMENT URS CORPORATION FOR ENGINEERING SERVICES TO DESIGN ELDORADO STREET ENHANCEMENT PROJECT
Approved Date
2/5/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit C — Scope of Services to be Provided by the ENGINEER <br /> � Retain Massie Massie and Associates of Springfield, Illinois as a subconsultant for: <br /> Layout of corridor streetscape improvements including street configuration, parking lanes, medians, <br /> sidewalks, pedestrian crossings, fences and barriers, light fixtures, benches, planters, entrance <br /> monuments, street signs, tree and planting areas,. <br /> Coordination and review meetings with the CONSULTANT, LA AND STATE. <br /> Coordinate, prepare graphic exhibits and participate in one(1)public information meeting and one (1) <br /> public hearing and meetings with landowners regarding easements and right of way needs. <br /> Prepare layout plans, details, specifications for street lighting, street furnishings (benches, planters, etc.), <br /> signs and monuments, street trees and planting areas. <br /> � Provide general and technical administration and quality assurance measures. <br /> Make such detailed surveys as are necessary for the planning, preliminary design and final design of the <br /> PROJECT. <br /> Perform data collection. <br /> Perform Phase I Environmental Site Assessment and prepare Technical Memo. <br /> Perform supplemental traffic counts, analysis and prepare Traffic Analysis Technical Memo. <br /> Perform safety analysis and prepare Safety Analysis Technical Memo. <br /> Review proposed streetscape improvements for impact on capacity and intersection level of service. <br /> Prepare plan sheets and typical sections with landscape improvements and other proposed geometric <br /> features. <br /> Prepare an Alignment and Capacity Technical Memo. <br /> Establish existing and proposed rights of way and property lines. Prepare Right of Way Technical Memo <br /> summarizing takes, impacts and remainders. <br /> Inventory existing property ingress/egress and circulation conditions. <br /> Evaluate impacts of proposed improvements on ingress/egress and circulation. Prepare Access Study <br /> Technical Memo. <br /> Compute construction quantities and unit costs and summarize in a Cost Estimate Technical Memo. <br /> Plan, schedule, attend and document up to fifteen (15)stakeholder meetings, one (1) public information <br /> meeting and one (1)public hearing. <br /> P�epare a Public Involvement Technical Memo. <br /> Prepare and submit a preliminary report which summarizes the Technical Memos. <br /> Prepare the final report by revising the preliminary report based on LA and STATE review comments. <br /> Submit the final report and make a formal presentation to the LA. <br />
The URL can be used to link to this page
Your browser does not support the video tag.