My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2007-17 AUTHORIZING AGREEMENT URS CORPORATION
COD
>
City Clerk
>
RESOLUTIONS
>
2007
>
R2007-17 AUTHORIZING AGREEMENT URS CORPORATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 10:44:49 AM
Creation date
11/2/2015 10:44:47 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2007-17
Res Ord Title
AUTHORIZING AGREEMENT URS CORPORATION FOR ENGINEERING SERVICES TO DESIGN ELDORADO STREET ENHANCEMENT PROJECT
Approved Date
2/5/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, 9. The undersigned certifies neither the ENGINEER nor I have: <br /> a. em lo ed r r t ' <br /> p y o e ained for commission,percentage,brokerage,contingent fee or other considerations,any firm or person(other <br />, than a bona fide em lo ee workin I <br /> p y g so ely for me or the above ENGINEER to solicit or secure this AGREEMENT <br /> b. agreed,as an express or implied condition for obtaining this AGREEMENT,to employ or retain the services of any firm or <br /> person in connection with carrying out the AGREEMENT or <br /> c. paid,or agreed to pay any firm,organization or person (other than a bona fide employee working solely for me or the above <br /> ENGINEER)any fee,contribution,donation or consideration of any kind for,or in connection with, procuring or carrying out the <br /> AGREEMENT. <br /> d. are not presenUy debarred,suspended,proposed for debarment,declared ineligible or voluntarily excluded from covered <br /> transactions by any Federal department or agency, <br /> e. have not within a three-year period preceding the AGREEMENT been convicted of or had a civil judgment rendered against <br /> them for commission of fraud or criminal offense in connection with obtaining,attempting to obtain or performing a public <br /> (Federal,State or local)transaction;violation of Federal or State antitrust statutes or commission of embezzlement,theft, <br /> forgery, bribery,falsification or destruction of records,making false statements or receiving stolen property, <br /> f. are not presently indicted for or otherwise criminally or civilly charged by a government entity(Federal,State or local)with <br /> commission of any of the offenses enumerated in paragraph (e)and <br /> g. have not within a three-year period preceding this AGREEMENT had one or more public transactions(Federal,State or local) <br /> terminated for cause or default. <br /> 10. To pay its subconsultants for satisfactory performance no later than 30 days from receipt of each payment from the LA. <br /> 11. To submit all invoices to the LA within one year of the completion of the work called for in this AGREEMENT or any subsequent <br /> Amendment or Su lement. <br /> PP <br /> i 12. To submit BLR 05613, En ineerin Pa ment Re rt to the STATE u on com letion of the r ' <br /> 9 9 Y po . p p p o�ect(Exhibit B). <br /> 13. Scope of Services to be provided by the ENGINEER: ($@@ EXhll�lt C) <br />, ❑ Make such detailed surveys as are necessary for the planning and design of the PROJECT. <br /> ❑ Make stream and flood plain hydraulic surveys and gather both existing bridge upstream and downstream high water data and <br /> flood flow histories. <br /> ❑ Prepare applications for U.S.Army Corps of Engineers Permit, Illinois Department of Natural Resources Office of Water <br /> Resources Permit and Illinois Environmental Protection Agency Section 404 Water Quality Certification. <br /> ❑ Design and/or approve cofferdams and superstructure shop drawings. <br /> ❑ Prepare Bridge Condition Report and Preliminary Bridge Design and Hydraulic Report, (including economic analysis of bridge or <br /> culvert types and high water effects on roadway overtlows and bridge approaches). <br /> ❑ Prepare the necessary environmental and planning documents including the Project Development Report, Environmental Class of <br /> Action Determination or Enviro�mental Assessment,State Clearinghouse,Substate Clearinghouse and all necessary <br /> environmental clearances. <br /> ❑ Make such soil surveys or subsurface investigations including borings and soil profiles as may be required to furnish sufficient data <br /> for the design of the proposed improvement. Such investigations to be made in accordance with the current Standard <br /> Specifications for Road and Bridge Construction, Bureau of Local Roads and Streets Administrative Policies, Federal-Aid <br /> Procedures for Local Highway Improvements or any other applicable requirements of the STATE. <br /> ❑ Analyze and evaluate the soil surve s and structure borin s to determine the roadwa str <br /> Y uctural desi n and brid e foundation. <br /> 9 Y 9 9 <br /> ❑ Prepare preliminary roadway and drainage structure plans and meet with representatives of the LA and STATE at the site of the <br /> I im rovement for review of lans ri r <br /> p p p o to the establishment of final vertical and horizontal alignment, location and size of drainage <br /> structures,and compliance with applicable design requirements and olicies. <br /> P <br /> ❑ Make or cause to be made such traffic studies and counts an <br /> d s ecial intersection studies as ma be re uired to fumish suffici <br /> p ent <br /> Y 4 <br /> data for the design of the proposed improvement. <br /> ❑ Complete the general and detailed plans,special provisions and estimate of cost. Contract plans shall be prepared in accordance <br /> with the guidelines contained in the Bureau of Local Roads and Streets manual. The special provisions and detailed estimate of <br /> cost shall be furnished in quadruplicate. <br /> ❑ Furnish the LA with survey and drafts in quadruplicate all necessary right-of-way dedications,construction easements and borrow <br /> pit and channel change agreements including prints of the corresponding plats and staking as required. <br /> Page 2 of 8 BLR 05610(Rev.9/O6) <br /> Printed on 1/30/2007 1:58:10 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.