Laserfiche WebLink
—� <br /> Local Agency I State Comraci !I Day Labor Local Concract i RR=orce Account � <br /> � illinois Department � I -._. � . _ <br /> of Transportation City of Decatur !I <br /> Local Agency Agreement Section Fund Type j ITEP Number'���-' <br /> i <br /> for Federaf Participation 06-00625-00-SW STE I 4�2�0� 2��7 � <br /> � <br /> Construction En ineerin �•�- F�i ht-of�Wa�.... d ! <br /> Job Number Project Number Job Number Project Number ��oti'Number°-�-W --; ..=Pr.nject�Jumber i <br /> I P-97-027-07 TE-OOD7(29) I <br /> This Agreement is made and entered into between the above local agency hereinafter referred to as the"LA" and the state of Illinois, acting <br /> by and through its Department of Transportation, hereinafter referred to as"STATE". The STATE and LA jointly propose to improve the <br /> designa'ted location as described below. The improvement shall be constructed in accordance with plans approved by the STATE and the <br /> STATE's policies and procedures approved and/or required by the Federai Highway Administration hereinafter referred to as"FHWA". <br /> Location <br /> Local Name Eltlorado Street Route US 36 Length 0.65 mi. <br /> Termini Church Street to Canadian National Illinois Central Railroad near Front Street <br /> Current Jurisdiction City of Decatur Existing Str. No <br /> Project Description <br /> Description: Preliminar}�design of streetscape improvements, including survey, data collection; environmental site assessment traffic and <br /> capacity analysis, alignment and geometrics, landscape architecture, public involvement; cost estimates and report preparation <br /> Division of Cost <br /> Type of Work FHWA % STATE % LA % Total <br /> Participating Construction ( ) ( ) ( ) <br /> Non-Participating Construction ( ) ( ) ( ) <br /> PreliminaryEngineering 124,000 ( * ) ( ) 31,000 � BAL � 155,000 <br /> Construction Engineering ( ) { ) ( ) <br /> Right of Way ( ) ( ) ( ) <br /> Railroads ( ) ( ) { ) <br /> Utilities ( ) ( ) ( ) <br /> TOTAL � 124,OD0 � $ 31,000 $ 155,000 <br /> * 80� STE funds NTE $124,000 � <br /> NOTE: The costs shown in the Division of Cost table are approximate and subject to change. The final LA share is dependent on the final Federal and <br /> 5tate participation. The actual costs will be used in the final division of cost tor billing and reimbursment. <br /> If funding is not a percentage of the total,place an asterisk in the space provided for the percentage and explain above. <br /> The Federal share of construction engineering may not exceed 15%of the Federal share of the final construction cost. <br /> Local Agency Appropriation <br /> By execution of this Agreement, the LA is indicating sufficient funds have been set aside to cover the local share of the project cost and <br /> additional funds will be appropriated, if required,to cover the LA's total cost. <br /> Method of Financing (5tate Contract Work) <br /> METHOD A---Lump Sum (95% of LA Obligation) <br /> METHOD B--- Monthly Payments of <br /> METHOD C---LA's Share divided by estimated total cost multiplied by actual proqress payment. <br /> {See page two for details of the above methods and the financing of Day Labor and Local Contracts) <br /> Page 1 of 4 BLR 05310(Rev.2/06) <br /> Printed on 2/7/2007 4:13:42 PM <br />