My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2007-09 APPROVING AGREEMENT AMENDMENT
COD
>
City Clerk
>
RESOLUTIONS
>
2007
>
R2007-09 APPROVING AGREEMENT AMENDMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 10:59:26 AM
Creation date
11/2/2015 10:59:26 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2007-09
Res Ord Title
APPROVING AGREEMENT AMENDMENT FOR DESIGN OF WATER BOOSTER PUMPING STATION FOR SOUTH ELEVATED WATER STORAGE TANK
Approved Date
1/22/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> Engineering & Infrastructure Memorandum <br />, No. 2007-03 <br /> January 11, 2007 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garma ity Manager <br /> John A. Smi , ssistant City Manager for Public Services <br /> Keith D. Alex der, Director of Water Management (� <br /> Matthew G Newell, P.E., Acting Director of Engineenng and Infrastruct <br /> Richard N. Berard, Civil Engineer II <br /> SUBJECT: Amendment to Agreement with Bainbridge, Gee, Milanski &Associates, Inc. for <br /> Design of Water Booster Pumping Station for South Elevated Water Storage Tank <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that City Council adopt the attached Resolution authorizing an <br /> amendment to an agreement with Bainbridge, Gee, Milanski &Associates, Inc., (BGM) to <br /> provide engineering services for the design of a water booster pumping station working in <br /> conjunction with the proposed water storage tank to create a separate pressure zone on the south <br /> side of the City. The proposed amendment is for an additional fee not to exceed $85,000.00. <br /> This will be added to the current $84,000 agreement with BGM to design the south water storage <br /> tank for a total fee not to exceed $169,000.00. <br /> BACKGROUND: <br /> At the City Council meeting of January 8, 2007, a report was presented providing staff's <br /> recommendation for the design of the proposed new south elevated water storage tank. City <br /> Council concurred with the recommendation to proceed with Option 2 which provides for <br /> growth of the water system to meet demands of future residential and commercial development. <br /> Implementation of Option No. 2 will result in the creation of a separate pressure zone for the area <br /> south of Lake Decatur; a feature that was not foreseen in the original design concept for the <br /> proposed new water tank. <br /> The scope of the original agreement with BGM was for siting and design of a new water tower. <br /> The proposal to develop a separate pressure zone for the south side requires the addition of a <br /> water pressure booster pumping station and isolation valves as well as reviewing the affect <br /> pressure zone will have on the south side area. This expansion to BGM's agreement is necessary <br /> to the development of a separate pressure zone. <br /> POTENTIAL OBJECTION: None <br />
The URL can be used to link to this page
Your browser does not support the video tag.