Laserfiche WebLink
Schedule of Work <br /> The table below presents the work schedule for the trolley study. This schedule is based on a <br /> four-month time period. This period is flexible depending on the specific requirements of the <br /> City. As shown, the surveys will be completed by about the sixth week of the study. The <br /> analysis and options efforts (workshops and meetings) will occur during the second and third <br /> months with the final report being developed during the fourth month. If the notice to proceed is <br /> issued before January 31, 2007, then work will be completed by May 31, 2007. <br /> Task ' <br /> I <br /> Nmice to Proceed � <br /> Task 1: Data Collection <br /> Task 2: Analysis <br /> Task 3: Options <br /> Task 4: Remmmendations <br /> = Client/Cansultant Meeting or Cnnference Call � =Workshops �= Draft Final Report <br /> = Surveys = Evaluation Meeting � = Final Report <br /> `-� = Report � = Presentotions <br /> Decatur Public Transit System 12 Trolley Study <br />