My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2006-192 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2006
>
R2006-192 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 11:26:15 AM
Creation date
11/2/2015 11:26:14 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2006-192
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT 2006 MANHOLE REPLACEMENT PROJECT
Approved Date
12/4/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineering & Infrastructure Memorandum <br /> NO. 2006-69 <br /> November 27, 2006 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garma ity Manager <br /> Matthew C. well, P.E.,Acting Director of Engineering & Infrastruct <br /> SUBJECT: 2006 Manhole Replacement Project, City Project 06-30 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for 2006 Manhole Replacement Project, City Project 06-30, to Entler Excavating <br /> Company, Inc., as the lowest, responsible bidder in the amount of$101,950.00, and that the Mayor <br /> be authorized to execute the contract, and the City Clerk to attest. <br /> BACKGROUND: <br /> The manhole project is designed to remove and replace structurally damaged manholes or small <br /> segments of sewers at various locations in the City. Ongoing televised sewer inspection and <br /> maintenance work performed by City crews identify damaged locations in the sanitary sewer system <br /> that need to be replaced. <br /> The project plans and specifications were prepared by Engineering Division staff. The project was <br /> advertised November 9, 2006, and bids were opened on November 27, 2006. The results for the <br /> letting are as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under) <br /> Engineer's Estimate $ 137,250.00 ---- <br /> Entler Excavating Co., Inc. $ 101,950.00 (-25.72 %) <br /> Barr&Robison <br /> Sewer &Excavating Co, Inc. $ 110,025.00 (-19.76 %) <br /> Entler Excavating Co., Inc. provided the low bid for the proposed work. Entler Excavating Co., Inc. <br /> has successfully completed several projects of this type for the City. Staff recommends that the <br /> City Council approve a contract with Entler Excavating Company, Inc. to perform the 2006 <br /> Manhole Replacement project. <br /> POTENTIAL OBJECTION: There are no known objections to this <br /> resolution and bid award. <br />
The URL can be used to link to this page
Your browser does not support the video tag.