My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2006-158 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2006
>
R2006-158 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 1:56:01 PM
Creation date
11/2/2015 1:56:01 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2006-158
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT 2006 ANNUAL WATER MAIN EXTENSION PROJECT
Approved Date
10/16/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� , � � <br /> ENGINEERING & INFRASTRUCTURE MEMORANDUM ' <br /> NO. 2006-60 <br /> October 3, 2006 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garma City Manager <br /> Matthew C. well, P.E.,Acting Director of Engineering & Infrastructur <br /> SUBJECT: 2006 Annual Water Main Extension Project, City Project 06-01 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for the 2006 Annual Water Main Extension Project, City Project 06-01, to Bodine <br /> Services of Decatur, Inc., as the lowest, responsible bidder in the amount of $441,168.00, and <br /> that the Mayor be authorized to execute the contract, and the City Clerk to attest. <br /> BACKGROUND: <br />' The proposed 2006 Annual Water Main Extension Project extends water mains on Tohill Road, <br /> Danny Drive, and Dawson Road on the south side of town. These extensions are a result of <br /> numerous requests for water service and the high number of potential customers. All customer <br /> connections outside of the City limits are double the normal water rate and require the customer <br />� to annex to the City when their property becomes contiguous to the corporate limits. <br /> The project also includes a water main extension on Alice Lane which will bore a water main <br /> from Taylorville Road (IL Route 48) under the highway and the Norfolk Southern railroad track <br /> to Alice Lane on the west side of the tracks. This water main will complete a loop to a dead end <br /> line on South St. Louis Bridge Road that will provide more stable water pressure and service in <br /> the area. <br /> The project plans and specifications were prepared by Engineering Division staff. The project <br /> was advertised September 1, 2006, and bids were opened on September 29, 2006. The results for <br /> the letting are as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under) <br /> Engineer's Estimate $460,483.00 ---- <br /> Bodine Services, Inc. $441,168.00 (-4.19 %) <br /> Burdick Plumbing& <br /> Heating Company, Inc. $475,873.00 3.34 % <br />
The URL can be used to link to this page
Your browser does not support the video tag.