Laserfiche WebLink
� , � � <br /> ENGINEERING & INFRASTRUCTURE MEMORANDUM ' <br /> NO. 2006-60 <br /> October 3, 2006 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garma City Manager <br /> Matthew C. well, P.E.,Acting Director of Engineering & Infrastructur <br /> SUBJECT: 2006 Annual Water Main Extension Project, City Project 06-01 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for the 2006 Annual Water Main Extension Project, City Project 06-01, to Bodine <br /> Services of Decatur, Inc., as the lowest, responsible bidder in the amount of $441,168.00, and <br /> that the Mayor be authorized to execute the contract, and the City Clerk to attest. <br /> BACKGROUND: <br />' The proposed 2006 Annual Water Main Extension Project extends water mains on Tohill Road, <br /> Danny Drive, and Dawson Road on the south side of town. These extensions are a result of <br /> numerous requests for water service and the high number of potential customers. All customer <br /> connections outside of the City limits are double the normal water rate and require the customer <br />� to annex to the City when their property becomes contiguous to the corporate limits. <br /> The project also includes a water main extension on Alice Lane which will bore a water main <br /> from Taylorville Road (IL Route 48) under the highway and the Norfolk Southern railroad track <br /> to Alice Lane on the west side of the tracks. This water main will complete a loop to a dead end <br /> line on South St. Louis Bridge Road that will provide more stable water pressure and service in <br /> the area. <br /> The project plans and specifications were prepared by Engineering Division staff. The project <br /> was advertised September 1, 2006, and bids were opened on September 29, 2006. The results for <br /> the letting are as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under) <br /> Engineer's Estimate $460,483.00 ---- <br /> Bodine Services, Inc. $441,168.00 (-4.19 %) <br /> Burdick Plumbing& <br /> Heating Company, Inc. $475,873.00 3.34 % <br />