My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2006-153 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2006
>
R2006-153 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 2:03:40 PM
Creation date
11/2/2015 2:03:40 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2006-153
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT GREEN STREET WATER MAIN REPLACEMENT
Approved Date
10/2/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
}. <br /> ' , , <br /> Engineering & Infrastructure Memorandum <br /> NO. 2006-56 <br /> September 20, 2006 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Garma ity Manager <br /> Matthew C. N 11, P.E.,Acting Director of Engineering & Infrastructur����""` <br /> Richard N. B r d, Civil Engineer II �� <br /> SUBJECT: Green Street Water Main Replacement, City Project 06-10 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended by staff that the City Council approve the attached resolution awarding the <br /> contract for the Green Street Water Main Replacement, City Project 06-10, to Bodine Services of <br /> Decatur, as the lowest, responsible bidder in the amount of$498,425.00, and that the Mayor be <br /> authorized to execute the contract, and the City Clerk to attest. <br /> BACKGROUND: <br /> This project will replace an existing 6 inch water main on Green Street between Main Street <br /> (Route 51 South) and Monroe Street with a 12 inch main. This section of water main is in poor <br /> condition and is approaching the end of its design life. The replacement of the water main will <br /> restore service reliability and ensure that fire flow requirements are met. <br /> The project plans and specifications were prepared by Engineering Division staff. The project <br /> was advertised August 29, 2006, and bids were opened on September 20, 2006. The results for <br /> the letting are as follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over (-Under) <br /> Engineer's Estimate $475,774.25 ---- <br /> Bodine Services of Decatur $498,425.00 4.76 % <br /> Burdick Plb. & Htg. Co., Inc. $508,672.00 6.91 % <br /> Bids exceeded the engineer's estimate largely due to the cost of pavement repairs exceeding <br /> those seen on past projects. High fuel costs and the difficulty of the work are the likely causes <br /> for this increase and are reasonable for the work to be done. Project estimates are based on <br /> previous work of a similar nature gathered either from past City work or Illinois Department of <br /> Transportation projects. <br /> Bodine Services of Decatur provided the low bid for the proposed work. Staff recommends that <br /> the City Council approve a contract with Bodine Services of Decatur to perform the Green Street <br /> Water Main Replacement Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.