My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2006-134 APPROVING EXPENDITURE
COD
>
City Clerk
>
RESOLUTIONS
>
2006
>
R2006-134 APPROVING EXPENDITURE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 2:37:19 PM
Creation date
11/2/2015 2:37:19 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2006-134
Res Ord Title
APPROVING EXPENDITURE EMERGENCY STREET REPAIR FAIRVIEW AVENUE AND ELDORADO STREET
Approved Date
9/5/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2006- 53 <br /> August 24, 2006 <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Gar City Manager <br /> Matthew . ewell, P. E.,Acting Director of Engineering & Infrastructure <br /> SUBJECT: Emergency Street Repair at Fairview Avenue and Eldorado Street <br /> . -� �/S !'1�1�- N"�/! .rt��-'41 t yc.�1 C�4 A�+�. <br /> SUMMARY RECOMMENDATION. .,oy�yNl�ti� , <br /> It is recommended by staff that the City Council approve the attached resolution approving the <br /> expenditure of$7,648.99 for emergency street repair at Fairview Avenue and Eldorado Street, and <br /> that the Mayor be authorized to sign said resolution, and the City Clerk to attest. <br /> BACKGROUND: <br /> On August 11, 2006, the City was informed of a sinkhole in the pavement of Fairview Avenue just <br /> north of Eldorado Street. From the street surface,the void under the pavement appeared quite <br /> large and it was determined that the affected lane should be closed until further review could be <br /> conducted. The City has maintenance jurisdiction of this portion of Illinois Route 48 and <br /> therefore took the lead of the investigation. <br /> Working with the Illinois Department of Transportation, the City closed Fairview Avenue in order <br /> to investigate the sink hole. The City could find no readily visible damage with a televised <br /> inspection of area storm and sanitary sewer pipes. The extent of pavement affected by the <br /> sinkhole and the likely depth of excavation required to adequately dig out the unstable material <br /> exceeded the City's ability to perform the wark. The City contracted with Barr&Robison Sewer <br /> an Excavatin t rem ve the av m n xcavate the sinkhole. <br /> d o o e e tande <br /> g P <br />� Work commenced on August 18th and was completed on August 22na <br /> POTENTIAL OBJECTION: There are no known objections to this resolution. <br /> INPUT FROM OTHER SOURCES: None <br />
The URL can be used to link to this page
Your browser does not support the video tag.