Project Name: STREET RECONSTRUCTION V i
<br /> Engineer's Estimate Dunn Company Illinois Valley Paving Co. ,
<br /> Project Number: 06-24 A Division of Tyrolt,Inc. 3151 Robbins Road
<br /> 724 N.Mercer St. Springfield,Illinois 62704 ''� �
<br /> City Engineering Division Decatur,Illinois 62522
<br /> Bid Date: Thursday,May 4,2006
<br /> Time: 10:00 A.M.
<br /> Fund: STREET IMPROVEMENT CAPITAL
<br /> Organization Code:45484516
<br /> Object Code: 460010
<br /> ��m Pay Item QTY Unit Unit Price Total Unit Price Total Unit Price Total
<br /> Number
<br /> 30103005 PULVERIZE,SHAPE AND COMPACT 6,116 SY $2.05 $12,537.80 $2.00 $12,232.00 $2.20 $13,455.20
<br /> 35200300 PROCESSING SOIL-CEMENT BASE CSE. 5,450 SY $5.35 $29,157.5 $5.45 $29,702.50 $5.78 $31,501.00
<br /> 35200500 CEMENT 3,673 100 WT $7.35 $26,996.55 $7.35 $26,996.5 $8.09 $29,714.57
<br /> 35200601 EARTH EXCAVATION 1,14 CY $32.10 $36,850.80 $24.75 $28,413.00 $30.21 $34,681.08
<br /> 40600100 BIT.MATL.(PRIME COAT) RC70/CSS-1H 4,360 GAL $2.68 $11,684.80 $2.10 $9,156.00 $3.16 $13,777.60
<br /> 40600980 BIT.SURF.REM.BUTT JT. 112 SY $9.00 $1,008.00 $9.90 $1,108.80 $17.04 $1,908.4
<br /> 44000004 BIT.SURF.REM.(FINAL TRIM 3/4 INCH TO 1 INCH) 5,450 SY $2.05 $11,172.50 $2.50 $13,625.00 $1.97 $10,736.50
<br /> 44000030 BIT.SURF.REMOVAL VARIABLE DEPTH 11,122 SY $1.90 $21,131.80 $1.80 $20,019.60 $1.65 $18,351.30
<br /> 44001010 ALVE BOX MILLING 33 EACH $50.00 $1,650.00 $41.00 $1,353.0 $52.90 $1,745.70
<br /> 44001030 CATCH BASIN/MANHOLE MILLING 22 EACH $50.00 $1,100.00 $41.00 $902.00 $54.25 $1,193.50
<br /> 44004250 PAVED SHOULDER REMOVAL 9,533 SY $5.20 $49,571.60 $4.50 $42,898.50 $5.25 $50,048.2
<br /> 44201709 CLASS D PATCHES,TYPE 3,5 INCH 80 SY $50.00 $4,000.00 $81.80 $6,544.00 $53.57 $4,285.60
<br /> 48202300 BIT.SHOULDERS SUPERPAVE,5 INCH 9,533 SY $13.50 $128,695.50 $15.45 $147,284.85 $18.09 $172,451.97
<br /> 60255500 MANHOLE ADJUSTMENT 12 EACH $952.80 $11,433.60 $1,265.00 $15,180.00 $217.86 $2,614.32
<br /> 60255800 MANHOLE ADJ.NEW T1F CL. 12 EACH $1,230.00 $14,760.00 $1,496.00 $17,952.00 $603.72 $7,244.64
<br /> 60266600 ALVE BOX ADJUSTMENT 27 EACH $612.00 $16,524.00 $599.50 $16,186.50 $188.05 $5,077.3
<br /> 60266800 ALVE BOX FRAME AND LID 20 EACH $139.00 $2,780.00 $159.50 $3,190.00 $352.37 $7,047.4
<br /> 70101800 RAFFIC CONTROL SPECIAL 1 LS $5,500.00 $5,500.00 $4,800.00 $4,800.00 $8,209.11 $8,209.11
<br /> X4066424 BC SC SUPER"D"N50 3,348 TON $57.50 $192,510.00 $62.75 $210,087.00 $72.47 $242,629.56
<br /> X4066614 BC BC SUPER IL19.0 N 50 1,118 TON $57.50 $64,285.00 $59.25 $66,241.50 $61.48 $68,734.64
<br />' Z0000124 SOIL CEMENT MIX DESIGN AND FIELD TESTING 1 LS $3,150.00 $3,150.00 $4,100.00 $4,100.00 $4,510.00 $4,510.00
<br /> Z0000125 FINAL PROJECT REPORTS 1 LS $3,000.00 $3,000.00 $1,500.00 $1,500.00 $1,650.00 $1,650.00
<br /> ������0
<br /> OTAL BIDS(AS CORRECTED) ��� $649,499.45� $679,472.80� $731,567.77
<br /> Percent Over Under ENGINEER'S ESTIMATE 4.61% 12.64%
<br /> �`,l��-� �- �5/- o �
<br /> Matthew C. Newell, P.E., City Engineer Date
<br />
|