My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2006-73 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
COD
>
City Clerk
>
RESOLUTIONS
>
2006
>
R2006-73 ACCEPTING THE BID AND AUTHORIZING A CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 8:59:06 AM
Creation date
11/3/2015 8:59:06 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2006-73
Res Ord Title
ACCEPTING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT STREET RECONSTRUCTION
Approved Date
5/15/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . <br /> COUNCIL COMMUNICATION FORM <br /> Engineering & Infrastructure Memorandum <br /> NO. 2006-33 '�I <br /> May 8, 2006 � <br /> TO: Honorable Mayor Osborne and City Council <br /> FROM: Steve Gar City Manager , <br /> Stephen Sw son, P.E.,Director of Engineering & Infrastructure��f <br /> Mathew C. Newell, P.E., City Enginee�� I <br /> SUBJECT: Street Reconstruction, City Project 06-24 �I <br /> SUMMARY RECOMMENDATION: I'i <br /> It is recommended by staff that the City Council approve the attached resolution awarding the I <br /> contract for Street Reconstruction, City Project 06-24, to Dunn Company, A Division of Tyrolt, 'i <br /> Inc., as the lowest, responsible bidder in the amount of $679,472.80, and that the Mayor be I <br /> authorized to execute the contract, and the City Clerk to attest. �� <br /> BACKGROUND: <br /> The Street Reconstruction Project is structured to provide a greater structural improvement to the <br /> affected roadway. Streets requiring reconstruction generally have pavement that is badly <br /> deteriorated through the combined effects of age and use. These pavements can no longer be <br /> effectively maintained by the City's street crews nor can a standard mill and overlay be applied with <br /> the hope of long term success. An additional goal of the project is to restore any existing curb and <br /> gutter to full function wherever possible. <br /> Street reconstruction work involves the removal of all, or portions, of the existing street, the <br /> construction of a stabilized road base and the placement of a new asphalt surface. A listing of the <br /> streets included in this year's reconstruction project is attached for your information. <br /> The project plans and specifications were prepared by Engineering Division staff. The project was <br /> advertised April 17, 2006, and bids were opened on May 4, 2006. The results for the letting are as <br /> follows: <br /> Compared to <br /> Engineer's Est. <br /> Bidder Bid Price Over(-Under) <br /> Engineer's Estimate $ 649,499.45 ---- <br /> Dunn Company, A <br /> Division of Tyrolt, Inc. $ 679,472.80 4.61 % <br /> Illinois Valley Paving Co. $ 731,567.77 12.64 % <br />
The URL can be used to link to this page
Your browser does not support the video tag.