My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2015-127 AUTHORIZING AN AGREEMENT Blank, Wesselink, Cook & Associates, Inc.
COD
>
City Clerk
>
RESOLUTIONS
>
2015
>
R2015-127 AUTHORIZING AN AGREEMENT Blank, Wesselink, Cook & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2015 8:46:40 AM
Creation date
11/20/2015 8:46:23 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2015-127
Res Ord Title
AUTHORIZING AN AGREEMENT WITH BLANK, WESSELINK, COOK & ASSOCIATES, INC. TO DESIGN THE NELSON PARK NEIGHBORHOOD STORM SEWER
Department
Public Works
Approved Date
11/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amounts shall not be billed to the City. Alternately,the Consulting Engineer may arrange to have <br /> plans and specifications made available to prospective bidders through the services of a plan and <br /> specification duplication firm that offers plan distribution services provided that the firm obtains <br /> the same bidder information as required of the Consulting Engineer and that no cost for this <br /> service be billed to the City. <br /> 5. Respond to Ouestions from Bidders Receive and respond to questions from prospective bidders <br /> during the bidding period. All responses shall be written and shall be provided to all plan holders <br /> as listed on the Plan Holder List. Questions received five(5)business days before the bid <br /> opening shall be answered. Questions received between four(4) and two(2)business days before <br /> the bid opening inay be answered provided that a means exists to communicate the answer in <br /> writing to all the bidders. Questions received one(1)business day before or on the day of the bid <br /> opening shall not be answered. Answers to questions should be distributed to bidders by email, <br /> however if a bidder does not have email service the documents may be transmitted by fax. <br /> 6. Tabulate and Evaluate Bids Recommend Award Prepare and provide to the City's <br /> Representative a bid tabulation which shall consist of a listing of all pay items in the contract <br /> documents, a listing of the Consulting Engineer's Opinion of Probable Costs, and a listing of the <br /> bids for each of the pay items submitted by each of the bidders. The Consulting Engineer shall <br /> tabulate the bids on an electronic spreadsheet form provided by the City's Representative.The <br /> Consulting Engineer shall assist the City's Representative in evaluating bids or proposals and in <br /> assembling and awarding contracts. The Consulting Engineer shall check the bidder's references <br /> and perfarmance on prior projects. Based on the Consulting Engineer's evaluation of the bids <br /> and the qualifications of the bidders,the Consulting Engineer shall provide to the City's <br /> Representative a written recommendation for award of the contract to one of the bidders or <br /> recommend other action as may be appropriate. The final selection of the Construction Contractor <br /> is the sole responsibility ofthe City Council. <br /> 7. Completion Time. Complete the bidding phase and prepare and submit the recommendation to <br /> the City's Representative for the award of the Contract(s)within the time period set forth in <br /> Exhibit C, Project Timeline. <br /> SECTION III. CITY'S RESPONSIBILITIES <br /> The City shall, <br /> A. FURNISH REQUIREMENTS AND LIMITATIONS Provide all criteria and full information as <br /> to the City's requirements for the Project, including design objectives and constraints, space, capacity <br /> and performance requirements,flexibility and expandability, economic parameters and any budgetary <br /> limitations; and furnish copies of all design and construction standards which the City will require to <br /> be included in the Drawings and Specifications. <br /> B. FURNISH INFORMATION. Assist the Consulting Engineer by placing at the Consulting <br /> Engineer's disposal all available information pertinent to the Project including previous reports and <br /> any other data relative to design or construction of the Project. <br /> Last Revised:04/29/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.